国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > FAQs
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn
Why timing roofing needs maintenance?
Why timing roofing needs maintenance? WHY why maintenance roofing needs timing? Foshan Steel Experience tells us: roofing needs 5-8 years to conduct a systematic overall view, maintenance or refurbishment intervals, this can effectively prevent damag...
2014/9/6
Prestressing steel reinforcement program
Prestressing steel reinforcement program [Problem] prestressed reinforcement steel student program? [Answer] prestressing steel reinforcement and construction technology program: Prestressing steel reinforcement program can be divided into two type...
2014/9/3
Multi-storey and high-rise steel column base grouting requirements
Multi-storey and high-rise steel column base grouting requirements [Student] multi doubt rise steel column base grouting and regulations? [Answer] In the first section of the frame after installation, calibration, bolt, that should be the bottom en...
2014/8/27
Steel construction?
Steel construction? 1, Foshan Steel system has a light weight, easy installation, short construction period, good seismic performance, contribution to recover faster, less environmental pollution and other comprehensive advantages, good ductility and...
2014/8/20
Features built steel structure analysis?
Features built steel structure analysis? Steel structure engineering technology uses Foshan Steel Works mainly in steel production, steel beams, steel columns, steel trusses and other components made ​​from steel and steel plate compositi...
2014/8/20
What are the characteristics of steel plant, composed of?
What are the characteristics of the steel structure plant, constitute? Foshan Steel plant refers to the use of steel and hot rolled, cold-formed or welded profiles made ​​by the convergence of convergence and transmission parts can with...
2014/8/20
FAQ steel welding process
FAQ steel welding disposal (B) the cold crack Generally refers to weld cold cracking during cooling down to the temperature changes in the temperature of martensite size (300-200 ℃ below) occurs, can be presented immediately after welding, and can ...
2014/8/16
Steel manufacture related test requirements?
Steel manufacture about experimental requirements? (1) Steel reinspection When the steel is one of the following conditions should be expected before processing the next reinspection: ① foreign steel imports; ② mixing different batches of steel ③ the...
2014/7/30
Control purposes tall buildings?
Control of high-rise building construction intentions? Foshan multi-layered steel high-rise buildings, the height of the large, high-rise buildings constructed in order to ensure the necessary rigidity Foshan Steel respond layer between the maximum d...
2014/7/26
The advantages and disadvantages of building steel plant?
Advantages and disadvantages of steel construction plant? Foshan Steel Advantages 1, widely use: apply to factories, warehouses, office buildings, stadiums, hangars and more. Both for single-large-span construction, can also be used to create a multi...
2014/7/26
Steel plant routine maintenance and upkeep of the building?
Construction of steel plant routine maintenance and conservation? 1, after we Foshan Steel plant installed on the owners concerned, can not be allowed to modify its structure, can not remove any of the bolts and other components, can not increase or ...
2014/7/26
Steel plant routine maintenance and upkeep of the building?
Construction of steel plant routine maintenance and conservation? 1, after we Foshan Steel plant installed on the owners concerned, can not be allowed to modify its structure, can not remove any of the bolts and other components, can not increase or ...
2014/7/19
page:13  1  2  3  4  5  6  7  8  9  10  11  12  13  14  pervious next  

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久久久久久99视频| 美女在线视频观看影院免费天天看| www二十四小时在线观看视频| 肉动漫在线看| 91短视频免费观看| 岳的屁股好大下面好紧| 99久久老司机免费精品免费| 百合扶她小说| 一个人视频在线观看免费观看| 重口绿帽小说1一9| 猫咪免费人成网站在线观看| 91精品国产综合久久久久久| 欧美一卡二卡三卡四卡乱码| 又黄又涩| 日本一卡2卡3卡4卡无卡免费| 日韩在线亚洲| 99久久99这里只有免费的精品| 中文国产成人精品久久一| 伊人久久中文字幕久久cm| 免费国产成人高清在线观看不卡| 综合久久久久| 成人综合在线视频| 白丝袜护士下面好滑好湿好大| 91香焦国产线观看看免费| 色多多视频在线观看免费完整版| 2021免费全国凤凰楼信息| 欧美毛片基地| 里番acg教室狂屠3d全彩| 日本成人不卡视频| 旗袍美女丝袜高跟老师| 伦理影院在线观看| 一 级 黄 中国色 片| 攻略高h| 麻豆传奇| 久草视频资源在线| 91次元无限破解版永久| 91p0rny九色国产| 嫩草影院入口| 奶大水多 叫的浪 好湿 好硬| 欧美特一级片| 99re热在线视频|