Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2039

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91网站在线播放| 一个人看的免费高清视频| 夜夜尻| 又大又硬又猛又黄又湿又爽| 久久中精品中文| 二次元美女被动漫网站| 俄罗斯奶水milkjapan挤奶| 在线免费观看网站| 美国一级毛片片aaa| 曰批全过程免费视频网址| 男人操女人b视频| 变态tickle丨vk折磨男| 旗袍丝袜美女双腿打开露内裤| ass老女人pjcsxxxx| 美国伦理片在线的免费观看爱你九周半| 久久精品2021国产| 中文字幕久荜一区日本精品| 7878www免费| 美女毛片在线看| fc2人气在线观看| 成人精品一区二区不卡视频| 最游记reload blast| 福利一区二区三区视频午夜观看| 成人男女网18免费网站| 日本免费一区二区三区中文| bt天堂国产亚洲欧美在线| 高h肉辣文交换| 夫妻主视频vk| 名优馆视频手机在线观看| 日韩精品你懂的在线播放| 一个人看的视频www免费| 全黄一级裸片视频在线观看| 奇米影视一区二区三区| 明星全黄h床戏小说| 高h喷水荡肉爽文np快穿| 男人j进女人屁股免费看| 日本动漫gaysexgay动漫| 中文字幕精品1在线| 日一级片| 人禽杂交视频网站在线观看| 一级片视频免费观看|