Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2040

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本我和子的乱视频| 在线无限观看次数破解版| 中国熟mature乱视频| 欧美多人换爱交换乱理伦片| 本色在线观看免费高清完整版| 人人做人人爽人人爱秋霞影视| 欧美色亚洲| 伊人网综合视频| 男人的j插女人的p| 久久伊人中文字幕麻豆| 尤物视频在线观看网站| 欧美成年性色mmm| 欧美人成片免费看视频不卡| 2019天天操天天干天天透| chinese国产hd范冰冰| 在线观看免费国产| 日韩欧美一中文字幕不卡| 鲁尔山视频精品久97人人爽| 边摸边吃奶边做动态图邪我粉33| 猛男gaygay免费网站| 明星ai换脸视频在线观看| 青青草香蕉| 蜜芽在线| 日本三线免费视频观看| 乱人伦在线资源中文字幕| 久久99国产亚洲高清观看首页| vr专区精品中文字幕| 一二三四观看视频中文在线观看| 日本免费一区二区三区中文| 女人18毛片视频一级毛片容| 中国老太婆bbbbbxxxxx| v视界影院| 宅男lu66在线网站| 欧美日韩性视频一区二区三区| 欧美老少欢videossexhd| 一个人免费观看www视频| 免费看全过程曰批40分钟| 99热精品一区| 成年人视频免费看| 九九热在线观看| 亚洲综合在线观看一区www|