Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:1771

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美高清360| 绿巨人www在线观看| 久久精品成人免费看| 一个人看的www高清观看| 看免费视频| 亚洲一区精品视频在线| 另类专区亚洲| 古天乐版神雕侠侣免费观看| 伦理在线视频| 免费看的视频| 欧美一级在线观看| 岛国二区三区| 毛片随便看| 三级图片小说| 男人躁女人躁的好爽免费视频| 999热视频| 蜜桃狠狠色伊人亚洲综合网站| 综合小说图片| 日本人日b| 在线看欧美成人中文字幕视频| 久久青青成人亚洲精品| 日本搞逼视频| 夜夜撸在线影院| 99久久成人国产精品免费| 成人中文字幕一区二区三区| 岛国视频在线观看免费播放| 97麻豆精品国产自产在线观看| 奇米影视奇奇米色狠狠色777| 靠逼网站免费看| 久久精品这里热有精品| 轻点疼好痛太粗免费视频| 欧洲grand老妇人| 99亚洲精品| 免费高清一级欧美片在线观看| 俄罗斯videosdesexo孕交| gynoclinicd妇检free| 91色交视频| 一个人免费观看www高清视频| 日韩视频中文字幕专区| 伊人精品视频| 中文字幕成人免费高清在线|