国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Problems needing attention in the process of steel structure construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:2234

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91麻豆传传媒波多野衣久久看 | 嫩草社区 | 一级一片 | 日本a级在线 | 四虎永久精品免费观看 | 欧美性满足hd1819 | 成人久久久久 | 搞av网 | 日韩国产欧美成人一区二区影院 | 91久久国产精品 | 啪啪蕾丝裸乳开裆情趣内衣 | 搞逼免费视频 | 日韩欧美大片 | 日韩中文字幕在线有码视频网 | 久草网站在线 | 丁香六月婷婷在线观看视频 | 噜噜影院无毒不卡 | 天天拍天天色 | 青草视频在线观看免费资源 | 99热久久精里都是精品66 | 婷婷六月激情 | 林夕雪被两个黑人 | 一个色综合久久 | 日本欧美黄色 | 日韩久久网 | 欧美成人不卡一区二区三区 | 免费男人狂躁女人在线看免费 | 99精品一区二区免费视频 | 色综合天天综合网国产成人 | 放荡白丝袜麻麻 | 男人扒开美女屁股的网站 | 日韩精品欧美一区二区三区 | 欧美激情高清免费不卡 | 青青草国产精品欧美成人 | 欧美亚洲一区 | 秋霞一级片| 色尼玛图 | 欧美一级片a | 久久午夜夜伦鲁鲁影院 | 日韩欧美视频免费观看 | 成人欧美一区二区三区视频xxx |