Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:1771

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 美女扒开腿无遮挡私密部位| 爱情岛成人亚洲www论坛| 女人是男人的女未来1分54| 卡一卡二卡三专区免费看| tube美国xxxx69| 这里是九九伊人| 日本欧美中文字幕人在线| 日本少漫画口工番工全彩| 成人无码嫩草影院| 日本tube老少配| 粉嫩αv| blackberry手机| 欧美成人资源| 毛片免费在线观看网站| 免费观看视频| 欧洲美女1819| 调教丝袜老师| avhd101看高清视频| 日韩高清影视| 欧美黄色tv| 青青青青久久久久国产的| 6080新觉视午夜伦毛片| 日本波多野结衣字幕久久| 日本xx69| 在线免费观看成人| 久久精品一区二区国产| 欧美5g影院天天爽天天看| 久久精品无码一区二区三区| 97夜色爽爽影院在线观看| 99久久精品免费视频| 欧美日韩国产在线观看一区二区三区| 主人在调教室性调教女仆照片| 久久亚洲日本不卡一区二区| 久久大胆视频| 久操青青| 亚洲在线视频一区| 艾操网| 在线免费观看视频| 欧美日韩午夜精品不卡综合| 久草免费网站| 91av国产精品|