What are the methods for strengthening the components of steel structure factory buildings?

Time:[2022-12-7]  Hits:2027

In steel structure plants, the most common components are steel columns and steel beams, which are a large part of the support and bearing, and the composition of the structure is an important component. The first component of steel structure plant is to be able to select different data to establish and form different data. The natural functions and quality of different data also have certain differences. It can also create different types of plants, such as multi-storey steel structure plant, light steel structure plant, brick concrete structure plant, etc. Only by controlling the quality of related components can the installation quality of all structures be improved.

 


1. Unloading method of steel structure column


When it is necessary to reinforce or replace new columns under unloading, the method of "joist and column replacement" shall be adopted. When only the upper column needs to be reinforced, the roof truss can be supported by crane beam bridge to unload the column. When the lower column needs to be reinforced or the process needs to cut off the lower column, a permanent joist can be set under the crane beam to share the load of the upper column (including the load of the crane beam) on the adjacent column (it is necessary to check the adjacent column and reinforce it, but also check the foundation). When selecting this method, it should be considered that after the joist is used to replace the lower column, the joist will have a certain deflection, forcing the original roof truss to sink, which may damage the connection nodes of the components connected to the roof truss. For this purpose, temporary load can be added on the joist in advance to make the joist have a pre deflection. The order of choosing this method is to strengthen adjacent columns, weld joists and adjacent columns, and add temporary loads Weld joists and center columns, remove temporary loads, and reinforce or cut off lower columns.


2. Reinforcement method of steel structure and steel column


The section of reinforced column in the reinforcement of steel structure workshop. Generally, steel plate or section steel is used to strengthen the section of reinforced column, welding bolts or high-strength bolts are used to connect the column as a whole, and additional supports are added. Add braces to reduce column length and improve positive bearing capacity. The stability of the column is proposed under the condition that the section standard is unchanged; Change the calculation chart to reduce the external force or internal force of the column; The reinforced concrete wrapped around the steel column can obviously improve the bearing capacity of the column.


3. Reinforcement of steel structure column base


There is no reinforcement method for the thickness of the column floor in the reinforcement of the steel structure workshop: add the stiffening rib of the column base to reduce the bending moment of the bottom plate, and pour concrete between the column base steel to make the column base plate become a rigid block, so as to improve the adhesion of the column base surface and eliminate the corrosion of the paint and the column base surface.


There is no reinforcement method for column foot anchor in steel structure workshop reinforcement: add additional anchor. Select when the concrete foundation is wide.


Drill holes on the concrete foundation, insert additional anchor rods, pour epoxy mortar or sulfur mortar (the hole diameter is 20 mm for the anchor rod, and the depth is more than 30 d), and wrap the entire column base with reinforced concrete. The new reinforcement shall extend into the foundation and be welded with the original reinforcement in the foundation.


4. Checking calculation of bearing capacity of steel structure column reinforcement


The important problem of reinforcement accounting under load is whether the stress after reinforcement can be redistributed, that is, whether the original section after reinforcement can distribute the original stress to the newly reinforced member section. If it can be redistributed, the sum of new and old loads can be evenly distributed to the new and old sections, otherwise the original load will still be borne by the original section, and the new and old loads will be evenly shared by the new and old sections (i.e. the total section after reinforcement).


So far, the redistribution of stress after reinforcement has not been fully proved by experiments (at least in the elastic stage), but for static loaded structures, when a part of the section enters the plastic situation, the stress will eventually be redistributed, so the static loaded structures can be accounted for by working together with new and old sections; In the case of dynamic load structure, the plastic zone is difficult to form, without considering the redistribution of stress, the situation before and after reinforcement is calculated separately, and then the sum is calculated.


The above problems do not exist when strengthening under unloading. Under the unloading condition, the section checking calculation shall be based on the total section after reinforcement, and the reinforcement reduction coefficient shall be considered. It shall be calculated according to the current standard, that is, according to the static load checking formula of the reinforcement section effect under the load condition. The same is true for the bar frame members and beams.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 深圳起重机,龙门吊,天车起重工程,电动葫芦,液压升降货梯-深圳市德力起重机械有限公司 | 浙江云野科技有限公司_智慧旅游规划_智慧景区管理系统_全域旅游解决方案-云野科技旅游大数据管理平台 | 绍兴上虞大成网络有限公司——因为专注,所以专业 | 重庆消杀公司-重庆斗哥环保科技-灭鼠公司-重庆灭蟑螂-除四害-灭老鼠-灭虫-重庆灭白蚁公司 | 精细筛-振动筛-滚筒筛-摇摆筛-平面回转筛-筛分机械设备-新乡德科筛分机械公司 | 景德镇市奥群包装材料有限公司| 液位变送器_智能压力变送器_3051差压变送器_单双法兰,投入式,电容式,温度变送器-淮安润中仪表科技有限公司 | 空气能热水器|空气能热水器工程|太阳能热水器工程|蓝冠机电 | 手板机箱_亚克力机箱_医疗机箱_美容机箱_医疗设备外壳厂家_鸿堪医疗器械有限公司 | 爬架网@建筑爬架网@冲孔建筑爬架网片@工地冲孔建筑爬架网片@工地冲孔建筑爬架网片厂家@工地冲孔建筑爬架网片生产厂家-安平县诺德金属制品有限公司 | 专注客流统计,客流分析,人流统计系统,客流计数器-广州市天威电子科技有限公司 | 湖南流水线-湖南自动化设备-湖南输送设备-湘潭市友工自动化设备有限公司 | 消防排烟风机|防火阀|斜流风机|江苏恒恒暖通设备有限公司 | 机械智能停车设备_智能机械式立体停车库_立体车库停车设备租赁_山东科博机械车库 | 腾云网-智慧网络营销服务提供商 套丝机_钢管套丝机_螺栓套丝机S8139_螺纹钢套丝机_智能套丝机价格-瑞捷机械设备有限公司 | 泰安led显示屏-泰安户外裸眼3D显示屏-扩声系统-舞台灯光机械-电子屏-肥城宁阳新泰东平-泰安市奇美特电子有限公司 | 山东健泽医疗科技有限公司-官网_深呼吸训练器_肋骨固定板_放疗定位膜耗材生产厂家招商 | 江苏广分检测技术有限公司、电力安全工具检测、苏州绝缘工具检测、昆山电力安全工具检测-广分检测技术(苏州)有限公司 | 无锡双海金属科技有限公司[官网]| 石家庄LED显示屏|石家庄显示屏|河北显示屏升级改造|石家庄科航光电科技有限公司_石家庄科航光电科技有限公司 | 阴_阳离子聚丙烯酰胺价格_聚合氯化铝厂家_聚合硫酸铁-巩义市亿洋水处理材料有限公司 | 尾矿干排_机制砂尾矿干排_带式压滤机|山东森鹏环保科技有限公司 潍坊卓瑞机械有限公司,输送设备,石灰消化设备,餐厨垃圾设备,化机浆设备,污泥脱水 | 门禁控制器-自动道闸-停车场系统-车位引导系统-车牌识别系统-楼宇对讲-可视门铃-门禁一卡通-河北京鹏电子科技有限公司 | 游戏加速器-极迅互联加速器-更快更稳的网游手游免费加速器 | 全自动烫金机-全自动移印机-全自动丝印机-全自动平面机-东莞联昌实业供应各种丝印机和移印机 | 上海家博会_2025上海家博会时间表_5月31-6月2日_上海家博会门票_免费领取入口 | 上海三凌自控阀门有限公司| 室内门十大品牌-生态木门厂家-室内门厂家 - 浙江威威工贸有限公司 | 小字符喷码机,激光喷码机,喷码机厂家_山东闪创电子设备有限公司 小型生活污水处理设备_MBR膜生物反应器_口腔医院/脱脂污水处理设备_酸洗磷化/喷涂废水处理设备-上海台江环保 | 云南昆明微信公众号小程序开发公司|抖音|网站建设APP制作-鸿翥网络 | 冷库出租_食品/医药冷库租赁_冷库改建/定制-北京亚冷 | 浙江桥梁检测车出租_杭州桥检车出租_桥梁检测车出租_桥检车租赁_桥梁检测车租赁-广州众诚设备租赁有限公司 | 酒类灌装机厂家_贴标机_灌装生产线-青州市锦德包装机械有限公司 酒店设计_建筑设计_室内装修装饰-北极点酒店设计公司 | 荆门市彩富机械有限责任公司|精铸件|五金|机械配件 | 廊坊微信营销,廊坊小程序开发,廊坊APP开发(安卓_苹果ios开发),微信朋友圈广告,百度推广,廊坊网络公司品牌服务商-河北盛秋网络科技有限公司 | 吉安天卓选矿药剂有限公司| 钠长石-硅铁-硅钙-孕育剂-球化剂-安阳李氏实业有限公司 | 聚丙烯酰胺,聚合氯化铝,重金属捕捉剂,污泥调理剂,活性氧化铝,生石灰,反渗透阻垢剂,工业葡萄糖,硫酸铝,果壳活性炭,柱状活性炭,蜂窝活性炭,石英砂,锰砂-北京雁归来环保科技有限公司-以真诚为立足之本,以质量为生存之本,愿与海内外同仁共创双赢。雁归来人一路走来,气贯长虹,勇锐盖过怯弱,进取压倒苟安!我们紧扣时代脉搏,专注水处理、继往开来! | 钠长石-硅铁-硅钙-孕育剂-球化剂-安阳李氏实业有限公司 | 中科先农农业(河北)智能设备有限责任公司 | 聚氨酯碰头,聚氨酯托辊,聚氨酯地辊/地滚轮/地轮/托绳轮-济宁卓力聚氨酯制品有限公司 |