国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > How to calculate the quantity of steel structures
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

How to calculate the quantity of steel structures

Time:[2023-4-19]  Hits:1341

The measurement of steel structures usually includes the following steps:


1. Identification and classification of structural components: Based on construction drawings and design documents, identify various components in steel structures, such as beams, columns, frames, nodes, etc., and classify them according to their types and specifications.


2. Measurement of component dimensions: Measure the dimensions of each component, including length, width, height, etc. Measurement tools such as measuring tapes, measuring instruments, etc. can be used for measurement.


3. Calculation of the number of components: Based on the measured component dimensions, calculate the number of each component according to the component layout and requirements in the design documents. Usually, formulas or professional software are used for calculations, such as automated measurement software.


4. Calculation of component weight: Calculate the weight of each component based on its size and density. You can calculate by searching for the density table of steel or using professional software.


5. Calculation of Unit Quantity of Components: Summarize the quantity and weight of each component to calculate the unit quantity of each component, usually in tons or cubic meters.


6. Summary and verification: Summarize the quantity, size, weight, and unit engineering quantity of all components, and verify the calculation results to ensure accuracy.

 

It should be noted that the measurement method of steel structures may vary depending on different countries, regions, engineering projects, and design specifications, and the specific measurement method should be determined based on the local actual situation and regulatory requirements. When measuring steel structures, it is necessary to strictly follow the design documents and relevant specifications to ensure accurate and reliable measurement results.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91久久久久久久| 久久精品国产99久久无毒不卡| 99精品视频看国产啪视频| 男人在线天堂| 一区卡二区卡三区卡视频| 欧美highheelsxxx| 二次元美女被超污安慰| 男人操女人逼视频| 看全色黄大色黄大片爽一下| 一级毛片在线免费看| 乱暴第一次18tubesex| 卡一卡二卡三免费视频大全2800| 大陆老太交xxxxxhd在线| www.日本高清视频.com| 怪物vodafonewifi巨大| 麻豆高清视频在线观看| 一级毛片免费视频网站| 欧美壮熊巨大gayvide0s| 日产精品一线二线三线区动漫| 日本宅男午夜免费永久网站| 九九免费精品视频在这里| 范冰冰大战黑人3p| 免费观看黄a一级视频| 日本免费第一区二区三区| javaparser野外| 15b0ys青年同志69gay| 久久大香萑太香蕉综合网| 成人一区专区在线观看| good韩国理论在线三级| 97婷婷色| 久久这里只有精品视频在线视频15| 日本网站在线看| 最新亚洲国产有精品| 欧美性高清hd| 猎户糙汉攻双性受全h| 911国产在线观看精品| 男女男精品视频站| swag贝拉| 久久99热只有视精品6国产| 日本高清免费在线观看| 楚乔传第二部(全60集)免费播放|