Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5250

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 大男人免费高清在线观看视频 | 色香蕉色香蕉在线视频 | 视频在线a | 热热涩热热狠狠色香蕉综合 | 老师下面湿了 | videost极度另类 | 日本天堂在线播放 | 91香蕉网站| 人人爱天天做夜夜爽 | 日韩美一区二区 | 最新一本大道香蕉综合 | 欧美日韩 国产区 在线观看 | 免费视频久久久 | 青草视频免费看 | 欧美黑白配性xxxxx | 全亚洲最大的免费私人影剧院 | 成人网页 | 男子摸100个不戴胸罩的美女 | 草莓视频香蕉视频 | v字仇杀队在线观看 | 久久国产精品亚洲va麻豆 | 老王福利网 | 婷婷丁香花 | 亚洲乱码一区二区三区国产精品 | 男人女人鸡鸡对鸡鸡 | 久热最新| 日韩三级视频在线 | 催眠性指导ova | 日韩视频在线一区 | 麻豆中文字幕在线观看 | 欧美一级艳片视频免费观看 | 高清hd老太老头做性 | 久青草香蕉精品视频在线 | 天天狠天天插 | 日本艳鉧动漫1~6完整版观看 | 啊用力太猛了啊好深视频免费 | 超在线视频 | 日本一道dvd在线播放 | 岳婿乱合集小说 | 男人扒开女人双腿泡妞视频 | 天天干夜夜操 |