Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:4852

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本成熟视频| 日本www在线播放| 操女生逼逼| 橘梨纱在线播放无删减| 欧美成人xxxx| 99在线热播| 在线色av| 91国产精品| 成人在线观看国产| www..com黄| 俺也来国产精品欧美在线观看| 欧美亚洲国产成人高清在线| 99视频在线精品| 成人蜜桃| 成人国产精品免费视频不卡| 一二三四免费观看在线6| 99re这里只有精品99| 在线小视频国产| 日本免费第一区二区三区| 久久不雅视频| 欧美视频在线网站| 怡红院成人在线| 99热官网| 波多野结衣gvg526系列| 欧美5g影院天天爽天天看| a在线看| 久久精品二三区| 中国hd高清xxxx| 99久久精品国产自免费| 日处女小说| 久久综合狠狠综合久久| 免费视频不卡一区二区三区| 绝美午夜暗香视频丨vk| 嘟嘟成人网| 啊好大好爽视频| 抽搐一进一出gif免费| 久久精品99| 日韩日韩日韩日韩日韩| 蜜芽在线观看网址| 成人综合在线视频| 日本女人被黑人操|