Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:4852

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 奇米第四狠狠777高清秒播| 欧美bbbbxxxxx| 欧美一区二区三区国产精品| 日本免费一区二区三区在线看| 一级毛片aaaaaa免费看| 日韩精品亚洲人成在线播放| 久草热8精品视频在线观看| 在线播放一区二区三区| 男人使劲躁女人视频免| 夫妻性生活黄色片| 日韩视频在线观看视频| 九一制片厂果冻传媒56| 美女野外勾搭路人做爰| 免费一区二区三区视频狠狠| 久久99久久99小草精品免视看| 欧美18vide0sex性欧美在线| 在线播放高清国语自产拍免费| 欧美视频免费一区二区三区| 北条麻妃初尝试黑人在线观看| 欧美视频在线网站| 日韩免费不卡| 中文字幕日韩欧美一区二区三区| 热热色影音先锋| 在线sese| 欧美日韩第一页| 6080午夜乱理伦片| 日韩精品免费在线视频| 久久鸭综合久久国产| 俄罗斯欧美一做一级爱| 久久香蕉国产线看观看精品蕉| 卡一卡二卡三免费专区2| ai换脸女明星被躁在线观看免费| hp同人小说| 久久综合久久综合久久| 久久精品一区二区免费看| 女人牲交一级毛片| 青青热久久国产久精品| 摘花过程处乌克兰| 1214sexvideos第一次| 久久国产亚洲偷自| beegxxxx日本|