Steel works construction schedule control content

Time:[2014-11-15]  Hits:5030

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久午夜精品| 欧美老肥熟| 久久99精品久久久久久国产人妖| 免费观看视频高清www| 纲手爆漫画羞羞漫画网站| 麻豆视频网站在线观看| 青青国产成人久久91| fefe66免费毛片你懂的| wwwcom日本| 久久久男人天堂| 九九热精品在线| 欧美日韩国产在线观看一区二区三区| np高h肉| 动漫美女被爆挤奶歪歪漫画| narutopixxx玖辛奈vk| 久久免费视频3| 日日操夜夜操天天操| 99精品久久久久久久| 蒂法被爆漫画羞羞动漫| 中国老头老太婆hdxxxx| 噜噜影院无毒不卡| free女厕所veidio性12| 一二三四视频观看中文在线看| 亚洲综合图片网| 99这里只有精品| 91精品国产91久久久久久青草| 伊人手机视频| 中国老太性xxxxxhd| 旧版草莓视频| 日本高清一区二区三区水蜜桃| 欧洲精品码一区二区三区免费看| 伦理片hd| 赶尸艳谈 在线播放| pormodoido欧美| 色噜噜色噜噜天天拍一拍| 日韩一区二区三区免费体验| 高清免费在线观看| 日本在观线免费观看| 亚洲曰本大成网站mmm| 2019天堂精品视频在线观看| 欧美成人h白雪公主在线观看|