Engineering Technology: General requirements for inspection of steel structure engineering foundation

Time:[2015-1-14]  Hits:4194

Engineering Technology: General requirements for inspection of steel structure engineering foundation

     Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the building, such as review, and should be the basis for the handover inspection and acceptance. Such as anchor bolts required to review each bolt axis, elevation, to go beyond regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual location of re-drilling screws.
     When the transfer of basic engineering batches, each less than a handover acceptance column base can form the basis of the degree of spatial steel mounting unit and shall meet the following requirements: basic strength of concrete to meet the design requirements; tamp backfill around the foundation is completed; foundation the elevation and the datum axis signs and point accurate and complete; the top surface of the foundation should be flat base surface of the secondary should be watered at cutting hair, anchor bolts should be intact.
The column axis bomb test in place of the column base surface.
     The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base design elevation), the installation is a steel plate or take advance using slurry leveling boards.
     When using the steel plate to make the support plate, the steel plate in the area before the bottom of the column should be secondary grouting withstand tensile load and bolt tightening calculated and determined according to the following compressive strength of concrete foundation, columns soles of the feet. Base plate and the contact surface and the bottom surface of the column should be smooth, tight.
     When the syrup should be used to sit for the board using non-shrink mortar, mortar pad before lifting pillar strength should be higher than a grade basis of concrete strength and mortar pad area should be sufficient to meet the requirements of hosting.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 500福利笫一精品导航| 爱情岛论坛永久免费| 51精品视频免费国产专区| 成人国产免费| 久久久久久久综合狠狠综合| 免费成年人| 久久一本一区二区三区| 青青青国产免费全部免费观看| 欧美在线观看免费一区视频| 99免费在线观看视频| 高清在线精品一区二区| 中文字幕在线视频在线看| 欧美黑人巨大硬xxx猛性| 一二三四视频社区在线7二| jj视频网站免费| 波多野结衣gvg526系列| 真人一级毛片| japonensisfes老师| 九九视频免费精品视频免费| 99re这里只有精品99| 日韩欧美在线观看视频一区二区| www.四虎影院在线观看| 男人把美女的扒了摸动漫| 色xx综合| 青青国产精品视频| 嫩草影院久久国产精品| 久久这里有精品视频| 欧美另类jizzhd| 日本视频在线观看免费| 成年人小视频在线观看| 高辣h浪荡小说校花系花2| 青青草国产97免久久费观看| 浪潮a国内一区浪潮在线| bt7086 福利二区 最新合集| 高清免费在线观看网址入口| 撞击她的娇嫩高h| 又粗又大又硬好爽我还要| 欧美亚洲日产在线二| 日韩成人免费在线| 99热久久这里只精品| 一级做a爱过程免费视频韩国|