国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Guangzhou Steel tells you: the technical requirements of tall steel structure of the device which
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Guangzhou Steel tells you: the technical requirements of tall steel structure of the device which

Time:[2015-7-1]  Hits:3917

Guangzhou Steel tells you: the technical requirements of tall steel structure of the device which


(1) Preparation: include preflight and supporting steel members, positioning axes and elevation view and anchor bolts, steel components on-site stacked mechanically selection means to determine the division and order means the water segment, labor approach Wait.
(2) multi-storey and high-rise steel structure lifting, based on the sub-area, multi-use integrated lifting method, the lifting procedure is usually: flat from the beginning or a certain symmetry between the middle section to a section between the column net for a Lifting unit, supported by steel columns → → order hoisting steel beams, and to extend all around; the vertical direction from the bottom constitute a stable structure, the cross member in the same section of the column range, typically downward from the upper layer by layer device. Take symmetry means symmetry fixed technology, help to reduce the accumulated error and the node device welding distortion to a minimum.
When the device, usually by lifting program to lifting operations divided region by region, the equal division of the order will be together. When lifting a zone is completed, namely measurement, calibration, high-strength bolts and other processes early twist until several area means completed, and then the whole structure of the measurement, calibration, high-strength bolts final twist, welding. Next, the following section steel column lifting. Guangzhou Steel
Steel columns (3) high-rise buildings is usually 2 to 4 layers of a section, hoisting cranes usually use a little positive. Steel column device in place, alignment axis, correcting verticality to loosen the hook after provisional fixation.
When the means of positioning each section steel columns axis should lead directly on the ground control axis, the axis can not lead from the lower column. All member devices within range of each section of the column, welding, bolting is completed and after acceptance, in order to control the axis of lead measured on a section of the column positioning axis from the ground.
(4) of the same section columns, steel beams across the same range, down from the appropriate device. Steel beam means finished, staircases and floors should apparatus pressure plate within the scope of this section of the column immediately.
(5) construction of the device, it should pay attention to sunshine, welding and other thermal influence caused by temperature changes and changes to the telescopic member due to bending, and shall take appropriate action. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 九一制片厂果冻传媒麻豆杨柳| 久久综合精品视频| 综合欧美亚洲| 大肥女ass肥妞| 一级a毛片免费观看久久精品| 99香蕉国产线观看免费| 又粗又大又硬又爽的免费视频| 2019理论国产一级中字| 被公公操| 免费一级毛片在线观看| 女教师紧身裙一区二区| 日韩 ed2k| 久久就是精品| 日本xx69| 中国成人在线视频| 91天堂素人精品系列全集亚洲| 成人精品一区二区不卡视频| 青草青青高清影院在线观看| 老色鬼福利| 50免费高清在线观看| 操必网| 尤物777tv在线进入| 老司机精品99在线播放| 大杳焦伊人久久综合热| laowang在线精品视频| 在线欧美视频免费观看国产| 美女张开腿让男生桶免费观看| 乳姬在线观看| 日韩免费成人| 日本高清视频免费观看| 三级女明星冰恋开膛肠子| 动漫同性女被吸乳羞羞漫画| 超在线视频| 东方亚洲东方欧美色二区| 一卡2卡三卡4卡3卡欧美| sao虎桃红精品视频在线播放| 亚洲综合图| 放荡性漫画全文免费| 久热免费视频| 日本艳鉧动漫| 91高清在线|