Steel Engineering steel column means test requirements

Time:[2015-9-5]  Hits:4931

Guangzhou Steel News: Steel Engineering steel column means test requirements


Means should be checked before entering the member list member, commodity inspection certificate and design documents; the factory pre-assembled components had assembled on site, should be based on pre-assembled record. And member to conduct a comprehensive examination, including dimensions, bolt hole location and diameter, quantity and quality fittings, weld, conflicts surface, anti-corrosion coating, etc. to check for member deformation, defect, failure, it shall be in the ground to correct, repair, processing, after passing devices.
1, lifting
According to steel column shape, face, length, crane performance and other specific conditions, determine device hanging point location and number of steel columns. Commonly used methods hoisting steel columns rotation method, delivery method, sliding method, for heavy-duty steel columns can be dual-lift crane.
(Rotation method) steel columns transported to the site, a crane from the side, while lifting and rotation, and the column was rotated around the column foot steel column lift.
(Coasting method) Lift column with 1 to 2 behind the crane, make steel column column foot slip means a method in place to reduce frictional resistance between the column foot and the ground, laying the taxiway.
(Delivery method) Dual or multiple machines lift crane, one of the vice unit. In order to reduce friction with the ground foot steel column resistance, deputy machine hanging point selection in steel column below, cooperation from the host hooks; with the host of lifting, walking or swing deputy confidential, will be delivered to the column foundation foot steel column above and auxiliary machinery uncoupling unloaded, the host will place the column means.
Generally use a little positive hanging steel columns, lug located in capitals, pillar straight and easy on the proofreading; lifting points can be placed in the column length of 1/3, steel column tilted, not easy for the proofreading; for fine long steel columns, steel columns to prevent deformation, can be two or more points.
If the hoisting rope is directly binding on steel column itself, we need to pay attention to the four corners of the steel columns do corners prevent rope was cut; lashing place in order to prevent damage to the steel column partial extrusion, increase to strengthen the board, to increase the trellis column strut.
Before lifting the first floor finishing clean and roots, the operator in the steel column to the top of the foundation After hanging, each stand a good position, hold the pedestal and position it in the foundation board, stop drop down to hook in the column when the foundation board, with a crowbar to pry the column, so where to align the center line of the column foundation, after checking the column foot axis aligned with the root plate, immediately spot welding positioning. If you are already welded connector plate pedestal, after a crane to align bolt connecting plate steel columns, steel columns down to the root bottom surface immediately with nut steel columns.
Dual or multiple machines should try to use the same type of a lifting crane, according to crane capacity, lifting points on the load distribution, each crane load should not exceed 80% of their respective lifting capacity, dual-lift crane, during operation , to cooperate with each other, coordinate action to prevent a crane weightlessness leaving another crane overload, forming accidents. Guangzhou Steel
2, steel columns Proofreading
The main component of steel, such as: columns, beams, roof trusses, roof rack, support, etc., should be immediately proofing device. And permanently fixed, should be proofread before a large apparatus, which is proof, however, and will affect the overall structure of the correct position, it is not allowed.
Column bottom level: According to the actual length of steel columns, column base flatness and capitals to distance from the bottom of the column, the column points to ensure top elevation value, and then decided to adjust the value of the foundation elevation.
Vertical and horizontal crosshairs: the bottom of the steel column production, steel punch in the next column base plate straight face play each other four faces, each face one point, with three points and crosshairs align bedrock surface can compete to reach the dotted line coincidence, if the deviation can be borrowed lines.
Straightness Column: Two columns theodolite looking at 90 ° angle on both sides of the straight, correct use of wind cable rope. After the first nut to constantly adjust the floor below, until it meets the requirements, screw on the floor above the double nut; loosen the cable wind rope, steel columns in a free condition, and then review the theodolite, such as small deviation, adjust and meet the requirements under the nut, The double nut tightening; corrected after the end of the nut and screw welding solid. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久免费99精品国产自在现线| 啪啪蕾丝裸乳开裆情趣内衣| 在线播放周妍希国产精品| 色吊丝永久性观看网站| 乳夹play| giantess羞羞漫画| 日本www高清视频| 热灸灸这里只有精品| 久久精品人人爽人人爽快| 在线观看成年视频| 免费看叼嘿视频| 耽美双性产乳| 野外性战 欧美| 456在线| 中文字幕日本精品一区二区三区| 欧美日韩另类在线观看视频| 欧美另类丰满熟扫乱xxxxx| 中国一级毛片aaa片| 林伟刘念曾经爱过我免费阅读全文| 97se亚洲综合自在线尤物| 中国处破摘花精品| 91亚洲精品色午夜麻豆| 99视频在线播放| 1769视频在线观看| 麻豆国产在线视频| 91制片厂制作果冻传媒星| cl1024地址一二三四五六七| 亚洲综合插插| 猎奇重口h恶心变态小说| 久久精品男人的天堂| 97色伦图片在线观看| 日本视频在线观看免费| 日本漫画乌翼鸟大全火舞| 久久91精品国产一区二区| 2020天堂中文字幕一区在线观| 真实的和子乱拍视频网站| japanese日本美妇bbw| yellow在线观看免费观看| 蜜桃网站在线观看| 日韩a一级欧美一级在线播放| 男男gaygays|