Steel supervision next station control points

Time:[2016-1-20]  Hits:4360

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 恋梦空间第一季| 日本三级唾液浓厚在线观看| 5252欧美在线观看| 美国一级毛片oo| 亚洲最大福利视频网| 日本精品久久久久久福利| 男人狂躁进女人下面的图片| 欧美成人精品一区二区三区| 男人人人阁| 日韩羞羞肉动漫免费视频| 波多野结衣gvg526系列| 日本视频一区二区免费播放| bdsmspanking群女受虐狂| 欧美挠脚心tickling免费网站| 暖暖 免费 日本 高清 在线10| 2021国产麻豆剧传媒官网| 91蜜桃在线观看| 曰批免费视频播放40分钟| 久久98精品久久久久久婷婷| 日本护士xxxxx高清免费| 青草视频在线免费观看| 9lporm自拍视频区在线| 宅男lu66在线网站| 浪荡受粗大贯穿np高h校花奶奴| 欧洲a级毛片| 男男gaychinese男男| 免费观看做爰视频ⅹxx| 草草影视在线观看| 岛国视频在线观看免费播放| 免费久草| 日日麻批免费视频播放40分钟| 欧美高清在线视频一区二区| 女人扒开腿让男生猛桶动漫| 高傲女教师麻麻被同学调教| 久久极品视频| 美女脱空| 免费视频毛片| 两个人看的www在线观看| 91色综合久久| 2022国产成人福利精品视频| ass芬兰大白屁股pic|