国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Steel supervision next station control points
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Steel supervision next station control points

Time:[2016-1-20]  Hits:4360

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 成年男女男精品免费视频网站| 久久久五月天| 日本中文在线播放| 99久久精品久久久久久婷婷| 另类视频在线观看| 99re这里只有精品国产精品| 最新老头恋老oldman1| 美女扒开腿无遮挡私密部位| 久久九九有精品国产23百花影院| 91综合在线| 爱爱小视频30分钟免费| 毛片免费在线观看| 女同性之间同床互摸视频| 公和熄洗澡三级在线观看| 日本视频中文字幕一区二区| 免费观看男人添女人下面的视频| 免费大香伊蕉在人线国产| 久久亚洲欧洲日产国码| 欧美一级做一a做片性视频| 日韩伦| 日韩视频精品在线| 一个人看的www片高清在线| 大奶肉文| 成人免费一区二区三区| 疯狂伦交小说200篇| 人与狗xxx| 免费va欧美在线观看| 免费看男人添女人下面视频| babesvideos性欧美老师| 99热99色| ass俄罗斯肥妇肥臀pics| sesese在线观看| x8x8国产精品视频| 嫩草影院成人| 99资源网| 欧美成人精品一区二三区在线观看| 公交车系列进入老师| 风间由美日本在线观看| 久久精品伊人网| 欧美69xxxxx| www.色94色.com|