raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4437

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本xxxtube按摩| 日韩成人免费在线视频| 看一级特黄a大片国产| 欧美日韩一区二区不卡| 一级毛片免费观看| 欧美视频二区| 美国伦理片在线的免费观看爱你九周半| 9久久免费国产精品特黄| a级全黄| 日本色色网| 亚洲自拍偷拍区| bl双性调教| 地址一地址二| 赶尸艳谈 在线播放| 尤物视频网站在线观看| 日本视频免费播放| 99在线免费| 一个人看的www的视频免费| 3d动漫美女被吸乳丨| 88aa四虎影成人精品| 久久香蕉国产| 91麻豆精品国产91久久久久久| 青青青在线播放| 纲手爆漫画羞羞漫画网站| 免费成人在线观看| 综合久久一区二区三区| 免费成年人视频在线观看| 丁香花在线视频观看免费| 久久青草免费线观最新| 中国一级特黄特级毛片| 麻豆精品国产剧情在线观看| 综合欧美亚洲| 欧美亚洲日产在线二| 97青青草原国产免费观看| h免费在线| 两个人免费视频观看bd动漫| 免费一级欧美大片视频在线| 在线观看免费毛片| 日本一卡2卡3卡4卡无卡免费| 那个男人的记忆法韩剧在线观看| 1024视频污|