raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4914

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲欧洲一区二区三区 | 99色这里只有精品 | 老师大ji巴好好爽好深h视频 | 亚洲成人福利 | 看全免费的一级毛片 | 暖暖韩国免费完整版在线观看6 | 中国xxxxx普通话对白 | 日日操网站 | 日韩欧美精品中文字幕 | 日韩av东京社区男人的天堂 | 青草视频国产 | 日本亚洲欧美国产日韩ay高清 | 1区2区3区4区 | 天天操夜夜草 | 一级毛片一级毛片 | 久久国产精品99久久久久久老狼 | 综合91| 日本人奶水中文影片 | 最近中文字幕无吗高清免费视频 | 99精品欧美一区二区三区 | 日韩成人在线观看 | 欧美又粗又长又湿又黄的视频 | 天天干天天干天天干天天干天天干 | 日本一区二区三区在线观看视频 | 巨胸丰满女教师 | 日本精品一区二区三区四区 | 欧美性乱 | 999精品在线视频 | 军同gaygay | 范冰冰videosfree高清 | 日韩日韩日韩 | 青草视频在线观看免费视频 | 日韩精品一区二区三区高清 | 特级一级毛片免费看 | 欧美在线不卡视频 | 五月婷婷爱 | 久久免费视频网站 | 最新顶级人妖shemale网站 | 天天插天天爱 | 欧美黄视频在线观看 | 综合久久国产对白 |