国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4437

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 永久黄网站色视频免费观看99| 久久久这里有精品| 楚乔传第2部免费观看全集| 俄罗斯高清三级在线观看| 免费挠脚心tikitiki网站| 在线成人福利| h录音 国产 在线| 美女和男朋友在一起差差差| 伊人久久精品午夜| 关秀媚无删减三级在线观看| 999热精品这里在线观看| 露脸 在线 国产 眼镜| 久久99久久精品97久久综合| 男人猛躁进女人免费观看| 久久se精品动漫一区二区三区| 9久久这里只有精品国产| 久热精品在线观看| 高清中文字幕视频在线播| 主播抠逼| 日本理论免费高清在线视频| 操大逼视频| ass俄罗斯肥妇肥臀pics| narutopixxx玖辛奈足控| 91大神精品网站在线观看| 乱欲美女| 18kkyy网站免费| 在线一区视频| 久久精品国产国产精品四凭| 免费的视频| 欧美另类丰满69xxxxx| 青青草国产精品欧美成人| 欧美日韩免费播放一区二区| 91大神在线免费观看| ppypp午夜限制不卡影院私人| 中国xxxxxxx日本| 99pao在线视频成精品| 伊人久久精品午夜| 99精品在线看| xxx 亚洲厕所撒尿| 久久精品www| 欧洲猛男gay狂巨大|