国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Steel optimize cost savings 70,000,000
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Steel optimize cost savings 70,000,000

Time:[2016-1-23]  Hits:4961

Guangzhou Steel News: Steel optimize cost savings 70,000,000

Guangzhou Steel News: "not only refers to the implementation of green construction and closed construction in the construction, no dust, no noise nuisance, the site is surrounded by flowers and grass planting, watering and other content execution timing when it comes to sustainable all aspects of development, such as content ecology and environmental protection, resource and energy use, social and economic development. The real green construction should be to 'green way' as a whole, to be applied to the construction of the entire construction process as a microcosmic System Science to carry out green construction design. "

Institute of Civil Engineering Guangdong Province recently held 2016 green construction demonstration project examples seminars and on-site demonstrations in Guangzhou, the Guangdong Provincial Institute of Civil Engineering Deputy Secretary-General said.

Demonstration Site: East Tower

Height of 530 meters of the East Tower, is the tallest building in Guangzhou. Not only does it set at the height of the building from the benchmark Guangzhou, but also in terms of green high-rise building construction also set a new "benchmark."

Development of high-rise building green construction assessment indicators

According to reports, the most difficult high-rise building green construction is no index for green construction of high-rise buildings, green construction process data scarcity, lack of construction waste separation and recovery of data, it is difficult to quantify resource consumption and construction waste, electricity is difficult Real-time automatic monitoring acquisition.

East Tower in the construction process, to develop a high-rise building green construction assessment indicators proposed structure during the construction dust is not greater than 0.5 m, foundation construction dust visual height of less than 1.5 m; building materials main material loss rate reduced by 30%; Saving 30 %, and strive to non-traditional sources and recycled water reuse more than 20%; reasonable layout, compact, to meet the environmental, occupational health and safety and civilized construction requirements of the premise as far as possible to reduce waste and dead ends, the temporary facility covers effective utilization rate greater than 90%.

Clock wireless monitoring system comprehensive monitoring energy consumption

Construction sites large electricity, saving energy is an important part of green construction. However, building high-rise buildings in particular, in the construction process energy control there is a problem, on the one hand Face scattered, many professional, involving civil engineering, steel, machinery, elevators, walls, decoration, lighting ......, statistics is extremely difficult; On the other hand, energy consumption no data reference, no norms to follow.

Construction process for the real-time control of each floor, the energy consumption data of each face, to achieve fine super high-rise projects, digital control, the East Tower project department to develop and deploy temporary electricity around the clock wireless monitoring system in the Face, each floor deployment data collection station and smart meters, through self-organizing wireless sensor networks self-routing of the way the data is sequentially automatically gathering from each floor to the ninth tier server.

Through this system, not only can see the meter location, number of rules and other information, you can view any loop "Today electricity", "last week", "last 30 days", "the most recent year," and any time period Histogram and electricity peak electricity periods, the minimum period of electricity energy values, and each face in electricity metering refined to minute, real-time control of the professional, electricity consumption for each service teams, can any time period according to Discover the various sub-units electricity consumption.

East Tower of energy monitoring for future green high-rise building construction has accumulated valuable experience data.

Structure "downsizing" to reduce the use of about 5,300 cubic meters of concrete

A lot of green construction methods, and the results are very different. In the East Tower, the most obvious green construction, most direct and most significant results from the innovative design, success comes from the main structure of "downsizing." In the East Tower, 30 floors below grade concrete increased from C60 to C80, the wall thickness from 1.8 m "downsizing" to 1.5 meters, an increase of about 1200 square meters of salable area, reducing the amount of approximately 5300 cubic meters of concrete, the structure of "downsizing "approximately 13,300 tons of carbon dioxide emissions by about 5300 cubic meters. Steel through optimized to reduce the amount of 7000 tons of steel structure of "downsizing" of about 52,500 tons, cost about 70 million yuan.

Demonstration Site: North Tower

Located in the central axis of the Pearl River New City CBD wealth center, it was called the "North Tower", is a classic green construction projects.

Wealth Center with a total construction area of ​​21.0477 million square meters, a total height of 309.4 meters, including 4 basement, ground floor 68. Its shape is very novel, the main building of "origami" type of innovative exterior design, get rid of the image of the traditional square box office; the main structure of the core tube frame with a reinforcing layer + Mega Braced Frame Structure System. The inner cylinder of reinforced concrete core wall, frame tube by the 20 giant steel columns and the east and west sides of the bracing system composed of a grid, in which the four corners of the four pillars creative use of the "inner circle of foreign" Duplex (double) steel concrete column.

Composite steel columns and materials giant earthquake

For small construction site, piling steel components less space, construction site haul roads lack, the construction unit in the construction of steel structure installation program optimization. The first application of composite steel giant column, reducing the thickness of the steel plate column, saving material steel. Four giant prism using "inner circle of foreign" Duplex (double) steel concrete columns, filled with high-strength concrete using steel ferrule effect can improve giant Japanese word column ultimate bearing capacity, while ensuring that the vertical column of giant Japanese word stiffness and ductility, to reduce the cross-sectional dimension of purpose, but also improve the seismic performance objectives, so that the elastic shock, earthquake do not yield. Secondly, under the crane lifting performance to meet the premise of reducing steel components segment, thereby reducing the time and site welding crane lifting capacity, saving energy. In addition, steel components in factory production process, acceptance and then transported to the site installation, to ensure project quality, achieve building component assembly of the installation and construction purposes.

Combination template support system green "taking into account the level of the core barrel floor structure construction lagged core tube vertical structure, vertical and horizontal transport more difficult, so the use of a combination of quick release aluminum templates and modular support systems combine modular plastic template Efficient template support system construction. "China Construction Industry Association Branch of green construction expert, professor level senior engineer, said.

According to reports, combined with quick release aluminum template support system with short construction period, reused more often, to facilitate the construction and high efficiency. Modular modular plastic template by optimizing composite structures, stability and rigidity make the template is greatly improved, with green, easy advantage of recycling, reducing construction waste, save a lot of timber, in line with the national "plastic wood, plastic steel, "the energy saving requirements.

 

"Fortune Center project construction process, and in ensuring the quality and safety of the premise, through scientific management and technological progress, to maximize resource conservation and reducing negative environmental impact of the construction activities, the realization of 'four a green'. At the same time the project Ministry of the characteristics of super high-rise construction projects, and actively promote the use of the building housing the Ministry of the ten major items of technology 9 35 sub-items, a variety of new technology innovations, and successfully applied in the construction of the project, effectively saving energy, time and materials section, green, to green construction requirements, "said:." implementation of green construction, help to improve enterprise management level; contribute to technological innovation, enhance the competitiveness of enterprises; help businesses save energy and reduce costs; also contribute to the smooth integration of enterprises with the international market. Green construction is construction eternal mission! "

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 南京样本设计,彩页制作,宣传册设计,画册设计印刷,包装设计公司,南京台历制作 | 箱式污泥采样器-全自动旋转振荡器-恒温石墨电热板-常州亿通分析仪器制造有限公司 | 无锡市恒威工业气体有限公司-工业高纯气体_高纯度特种气体 | 上海网站建设-上海网站制作-网站设计-上海做网站公司-SEO优化推广-咏熠软件 | 惠普工作站_联想工作站_HPE服务器_H3C服务器-河南金铭科技有限责任公司 | 重型钢板网|钢板网厂家|钢板网 - 高禄公司 | 卫生级自吸泵-不锈钢化工离心泵-上海胜欧泵阀有限公司 | 增压泵-离心泵-管道泵-排污泵-上海渤泉泵业制造有限公司 【官方网站】 | 转盘萃取塔,DMF回收塔生产厂家-无锡弘鼎华化工设备有限公司 | 金华美凡文化传媒有限公司| 江西铭鑫冶金设备有限公司-破碎机,铜米机,选矿摇床,电池回收设备 | 液力耦合器,摩擦型液力耦合器生产厂家-河南省华升矿机有限公司 | 无塔供水设备_无负压供水设备_变频供水设备_净化过滤设备_加油站油罐_S/F双层油罐_开封市东方供水设备有限公司 | 江阴市卡泰机械设备有限公司| 沈阳资质代办_代办建筑资质「快」-【华廷元】沈阳代办公司首页- 沈阳机电一体化电热锅炉_沈阳蓄热式电锅炉_沈阳壁挂式电锅炉【沈阳远鹏电热供水设备工程安装有限公司】 | 生物发酵罐(细菌/植物/液体玻璃实验室发酵罐设备)CIP清洗罐,灭活罐「厂家」-安徽赛德齐瑞发酵罐品牌 | 绍兴凯渥人力资源有限公司-劳务派遣,劳务分包,代办公司注册 | 联塑管代理,联塑管厂家批发,中财管总代理,康泰管代理,康泰管厂家批发-邯郸市中枢贸易有限公司 | 和远智能-和远智能科技股份有限公司 | 泊头压滤机-隔膜-洗沙-厢式-板框压滤机-河北巨盛压滤机制造有限公司 | 湖南一体化污水处理设备_二氧化氯发生器_一体化净水处理设备_消毒设备厂家-湖南东环环保科技有限公司 | 挖掘机|小型挖掘机|挖掘机抓木机|轮式挖掘机|宝鼎挖掘机-宝鼎液压机械公司厂家直销 | 建材制品燃烧热值试验仪_建筑材料不燃性试验仪-华阳试验机制造 | 手持电能质量测量仪-TD-1168多功能高空接线钳-上海妙定电气有限公司 | 室内通风系统,新风系统专卖,建筑通风系统专卖_绿岛风官网 | 压滤机入料泵_渣浆泵_耐磨污水泵_保定森力克水泵制造有限公司 | 上海浩斌信息科技有限公司RFID读写器,IC卡读卡器,手持机,数据采集终端,电力仓库管理软件开发,固定资产软件,纱管标签,试剂管理,RFID试剂柜,档案管理,档案柜,智能货架 | 河南豫冀锅炉容器制造有限公司 | 湿电电源,静电除尘电源,电捕焦电源-山东仕瑞电气科技有限公司 | 浙江三龙通用机械有限公司 圆丝机,拉丝机,复合机 | 珠海拾比佰彩图板股份有限公司 | 柔性测斜仪|滑动式测斜仪-华思(广州)测控科技有限公司 | 停车场设计|地下停车场规划设计|智能停车位地下车库设计施工装修|深圳创安顺停车库规划设计有限公司 | 三叶罗茨鼓风机_三叶罗茨风机厂家_山东九洲四海机械有限公司 | 山东礼品盒,礼品盒生产厂家,礼品包装盒厂家-济南恒印包装有限公司 | 驾驶洗地机|手推洗地车|天津洗地机|扫地车|仓库工厂扫地机|工业吸尘器|扫雪机|耐洁思 | 凿岩机|操车设备|爬车机|三环链|伞钻|伞型钻机|中心回转抓岩机|往复式给煤机|滚轮罐耳|吊桶|钩头-济宁卓力工矿设备有限公司 | 济南货架|济南仓储货架|济南仓库货架|山东蕴达金属制品有限公司 济南海纳特科技有限公司 | 无锡大型数控龙门铣加工中心,精密焊接件制造,机械设备加工-无锡嘉迅机械科技有限公司 | 医药招商 千虹医药网-专业的医药招商-医药代理-药品招商-药品代理信息发布平台 | 学习力_免费的在线学习网站_学习、分享、成长! |