Guangzhou Steel teach you: steel welding engineering

(A) material quality requirements
(1) Canton steel welding works with a welding rod, wire, flux, electroslag weld mouth, studs, welding porcelain ring and shielding gas welding, etc. must be used with a factory quality certification, quality inspection reports and other documents.
(2) Guangzhou steel welding engineering, the general principles of the weld metal and base the selection of materials, such as strength of welding rod, wire, solder and other welding materials.
(3) welding, flux cored wire, electroslag weld mouth and studs with ceramic ring before use, must be baked in accordance with the provisions of the product description and related welding processes.
(Ii) quality control during construction
(1) When the welding operations ambient temperature is below 0 ℃ but not lower than -10 ℃, welded joints and welding surface should be in each direction is greater than or equal to 2 times the plate thickness range of not less than 100mm is heated to not lower than 20 ℃ After the minimum preheat temperature specified above and before welding, and the welding process should not be below this temperature.
Room (2) pre-heating and temperature control channels should adopt electric heating, flame heating and infrared heating plus heat method, and using special thermometer measurements. Preheat the welding area should be heated on both sides of the groove width of more than 1.5 times the thickness of the weldment welding, and not less than 100mm. Temperature measurement point, when non-members should be on the back of an enclosed space heating surface in the weldment from both sides of the weld groove at not less than 75mm, when the member is a closed space should be in the front side from the weld groove at not less than 100mm. When the process of selection of the preheating temperature is below the minimum specification requirements should be determined by the procedure qualification test.
(3) non-sparking arc welds on the base metal outside the area. In the groove arc welding a local area should not be leaving the crater. When the arc plate, lead plate and spacer plate when the steel should be used in the yield strength of not more than the nominal strength steel is welded steel, and weldability similar.
(4) The multilayer welds should be continuous welding, weld bead after each layer should be cleared up.
(5) Such as design documents or the contract documents required butt eliminate stress, the structure of the tensile stress fatigue check node butt or weld-intensive, member, should adopt the electric heater and partial annealing furnace annealing overall and other methods of stress relief treatment; if only stable structure size, vibration method can be used to eliminate stress.
(6) with a hammer method to eliminate intermediate solder layer stress, you should use the network first hand hammer or a small vibrating tool, should not be the root of the weld, the weld cap weld or bevel edge of the base material hammer.
(7) carbon steel welds should be cooled to ambient temperature, low-alloy steel should be after the completion of the welding seam 24h NDT testing.
(8) checks should be carried out after bending test weld stud welding, stud weld and heat affected zone bend 30 ° after there is no visible cracks.
(9) the repair welds should be continuous welded parts, should be taken if an interrupt after welding heat insulation measures to prevent cracks; repairing defects in the weld of the same parts of the number should not be more than twice the area of ​​welded joints should be increased after the repair powder or colored checks.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 男女黄漫全身无遮挡网站动漫 | 老司机67194免费观看 | 色老板在线视频一区二区 | a黄色大片| 青青久久国产成人免费网站 | 日韩黄色小视频 | 色狠台湾色综合网站 | 男人天堂资源站 | 中文字幕在线看片成人 | 亚洲永久免费 | 操16p| 日韩成人毛片高清视频免费看 | 五月婷婷之综合激情 | 亚洲video | 爱豆传媒在线视频观看网站入口 | 在线观看h视频播放高清 | 午夜在线观看免费视频 | 男人的天堂在线精品视频 | 久久色综合网 | 欧美日韩国产一区二区三区 | 欧美一级第一免费高清 | 香蕉啪啪| 欧美特一级片 | 在线精品小视频 | 97成人免费视频 | 欧美另类久久久精品 | 日韩一级大片 | 日本无吗视频 | 亚洲草逼| 另类射图| 图片一区 | 青草视频.com | 小小的日本动漫在线观看免费高清 | 亚洲乱亚洲23p女 | 在线观看亚洲免费视频 | 小小的日本动漫在线观看免费高清 | 美女黄视频免费看 | 欧美一区二区三区美人 | 日韩a一级欧美一级在线播放 | 妹子第一次你就这么猛啊 | 中文字幕自拍 |