steel welding engineering

Time:[2016-1-23]  Hits:4278

Guangzhou Steel teach you: steel welding engineering

(A) material quality requirements
(1) Canton steel welding works with a welding rod, wire, flux, electroslag weld mouth, studs, welding porcelain ring and shielding gas welding, etc. must be used with a factory quality certification, quality inspection reports and other documents.
(2) Guangzhou steel welding engineering, the general principles of the weld metal and base the selection of materials, such as strength of welding rod, wire, solder and other welding materials.
(3) welding, flux cored wire, electroslag weld mouth and studs with ceramic ring before use, must be baked in accordance with the provisions of the product description and related welding processes.
(Ii) quality control during construction
(1) When the welding operations ambient temperature is below 0 ℃ but not lower than -10 ℃, welded joints and welding surface should be in each direction is greater than or equal to 2 times the plate thickness range of not less than 100mm is heated to not lower than 20 ℃ After the minimum preheat temperature specified above and before welding, and the welding process should not be below this temperature.
Room (2) pre-heating and temperature control channels should adopt electric heating, flame heating and infrared heating plus heat method, and using special thermometer measurements. Preheat the welding area should be heated on both sides of the groove width of more than 1.5 times the thickness of the weldment welding, and not less than 100mm. Temperature measurement point, when non-members should be on the back of an enclosed space heating surface in the weldment from both sides of the weld groove at not less than 75mm, when the member is a closed space should be in the front side from the weld groove at not less than 100mm. When the process of selection of the preheating temperature is below the minimum specification requirements should be determined by the procedure qualification test.
(3) non-sparking arc welds on the base metal outside the area. In the groove arc welding a local area should not be leaving the crater. When the arc plate, lead plate and spacer plate when the steel should be used in the yield strength of not more than the nominal strength steel is welded steel, and weldability similar.
(4) The multilayer welds should be continuous welding, weld bead after each layer should be cleared up.
(5) Such as design documents or the contract documents required butt eliminate stress, the structure of the tensile stress fatigue check node butt or weld-intensive, member, should adopt the electric heater and partial annealing furnace annealing overall and other methods of stress relief treatment; if only stable structure size, vibration method can be used to eliminate stress.
(6) with a hammer method to eliminate intermediate solder layer stress, you should use the network first hand hammer or a small vibrating tool, should not be the root of the weld, the weld cap weld or bevel edge of the base material hammer.
(7) carbon steel welds should be cooled to ambient temperature, low-alloy steel should be after the completion of the welding seam 24h NDT testing.
(8) checks should be carried out after bending test weld stud welding, stud weld and heat affected zone bend 30 ° after there is no visible cracks.
(9) the repair welds should be continuous welded parts, should be taken if an interrupt after welding heat insulation measures to prevent cracks; repairing defects in the weld of the same parts of the number should not be more than twice the area of ​​welded joints should be increased after the repair powder or colored checks.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 99玖玖爱视频在线观看| 日韩国产免费一区二区三区| 4hc44四虎最新地址| 999yy成年在线视频免费看| 超级乱淫怀孕小说全集| 色吊丝永久在线观看最新| 中国处破摘花精品| 日日干日日射| 日韩在线播放视频| 美女紧身裤裆看光了下面| 猛草影院| re99热久久这里只有精品| 额去鲁97在线观看视频| 最美情侣免费观看视频2019| 免费看在线高清视频| 欧美日韩综合高清一区二区| 8x8x拨插拨插| 青苹果乐园完整版在线观看| 热久久国产欧美一区二区精品| 免费啊v在线观看| youjizz日本xxxx69| 老师您的兔子好软水好多图片| 重口高h触手产卵np文| 麻豆系列| 日本最新男男gayjapanhd| 成年免费视频| 久久精品亚洲99一区二区| 91大神视频在线播放| 囚徒小说免费阅读| 青草青视频在线观看| 逼哩涩漫| 俄罗斯美女h肉在线观看| 狂野欧美性猛交免费视频| 欧美重口人妖free| 福利二区| 又大又粗又爽的三级小视频| 在线亚州| 欲海记 高h| 两个人看的www在线| 中国明星freesexhd图片| 日韩精品一区二区三区中文3d|