国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Steel construction work Technical Exchange
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Steel construction work Technical Exchange

Time:[2016-3-5]  Hits:4445

Guangzhou Steel News: Steel construction work Technical Exchange


Tests, content:
1. Guangzhou Steel construction personnel should be familiar with this type of work safety rules and technical skills to work, conduct disorder safety tests, education, job before the job is not suited to high-altitude, high-altitude operations personnel can not engage in prohibited entering the construction workers must be used correctly personal protective equipment. Qualified to wear helmets, fasten your chin buckle locking good. Climbing (2m or more) must wear seat belt hanging qualified jobs, with low hanging hung securely. Forbidden to wear slippers or plastic-soled shoes high-altitude operations, Do not drink and work.
2. electric welding operations, to holders of operating permits, fire permits and clean up around the inflammable and explosive materials, oxygen, acetylene bottles spacing distance should be consistent with the work specifications, welding wire should be in place, staffed with qualified and effective fire-fighting equipment , set up specifically to see the fire. Welder by a professional electrician complete disassembly, and what does not prohibit the operation of machinery and equipment.
3. Do not live operation, with a load connected to power lines is prohibited.
4. climbing operations must be worn tool bag, wearing non-slip shoes, tools, tool bag should be placed, not free on a steel beam or a place easily lost if the handheld tools (such as hammers, wrenches, pry bar, etc.) to put on a safety rope to prevent the loss hurt.
5. Field workers smoking, chasing. Special types of work must be certified.
6. Non-professionals shall not engage in electrical work, temporary overhead power lines laying, and good insulation measures to prevent scratch, hit, hit cable.
7. sling must be checked before use, do not meet safety requirements prohibited.
8. The lifting work full-time workers command signal, high lifting must be clearly visible semaphore or flute and intercom command, to be set up at the sight of two blind lifting operations command.
9. hanging objects at 0.3m from the ground when the lifting rigging inspection, determined safe before lifting, and crane overload operation is prohibited.
10. When lifting member, non-stop or put the container member scattered Unloaded member.
11. At the bottom of the arm member and play a major twist area, may not have staff to stay around.
12. The pull member seated in the cable should help in place, this time staff member should stand on both sides.
13. member in place, should be a fixed installation or post weld welding, non-use of temporary stacking, hold way to prevent accidents and falls from a height, must be firmly welded in place immediately after.
14. Canton steel operations use electrical equipment, to be done to stop people walking machines wind up its power before they can not stay hidden.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: aⅴ一区二区三区无卡无码| 91色国产在线观看| 日韩成人免费视频播放| 老头扒开我粉嫩的小缝| 俄罗斯xxxxxbbbbbb极品| 美女被扒开屁股进去的软件| 女女互慰吃奶互揉网站| 欧美色图综合| 不知火舞被啪到爽漫画| 怡红院亚洲红怡院天堂麻豆| ai造梦自带套赵露思| 50老熟败火自拍| 成人国产欧美精品一区二区| 一个人看的视频在线观看高清| 2022在线精品视频网站| 996久久国产精品线观看导航| 在线观看精品视频一区二区三区| 欧美e片成 人 在线播放乱妇| 95精品视频| 97天天做天天爱夜夜爽| 狂干美女| 一级黄视频| 春色www在线视频观看| 1819sextub欧美中国| 永久在线视频| 一日本道加勒比高清一二三| 中文字幕亚洲一区二区v@在线| 伊人影视大全| 欧美一级看片免费观看视频在线| 99久久影院| 999yy成年在线视频免费看| 久久精品综合视频| 中文字幕久久网| 免费国产成人综合| 免费视频在线播放| 放牛老汉与老头 恋老小说| chinese基友gay勾老师| 欧美日韩国产58香蕉在线视频| 青青国产线免观看手机版精品| 99在线视频网站| 鲁丝一区二区三区|