Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4049

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 免费观看视频在线观看| 菲律宾天堂的触摸| 三体免费看| 女女做爰全程免费视频| 久操综合| 热99在线| 5g天天嗨天天爽| 美女脱了内裤后打开腿让男人桶爽| 波多野结衣无限发射| 一级做a爱过程免费视频韩国| 在线观看亚洲精品专区| 久久精品视屏| 美女脱了内裤张开腿让女人添软件| 欧美性稚交6-12| 末成年娇小性色xxxxx视频| 在线欧美亚洲| japanese极品撒尿| 美女隐私羞羞视频在线观看| 秋霞午夜影网理论片视院| 半岛影院一级毛片| 成人国产欧美精品一区二区| 久久国产亚洲欧美日韩精品| 奇米小说首页图片区小说区| 男人的天堂你懂的| 奇米影视777四色| 99热手机在线观看| 免费国产zzzwww色| 成人久久久观看免费毛片| 久久成年人视频| 美女被男人扒开下面无遮无挡| 日韩成人在线播放| 么公的好大好硬好深好爽在线视频| 欧美做真爱免费观看| 中国xxxxbbbb精品| 96精品视频在线观看播放| 夜夜撸在线影院| 欧美性xxx18一20| 久久亚洲精品国产精品777777| 91桃色在线看片| 欧美日韩网| 久久久免费视频观看|