Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4049

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 九九热视频在线免费观看| 99热这里只有精品第一页| 青青草久久热| 免费福利入口在线观看| 欧美日韩精品一区三区| dy8888影院午夜看片| 嫩模李丽莎1分37秒在线观看| 暂停时间怀表acg(9)| 男人天堂最新网址| 两个人看的www视频中文字幕| 大杳焦伊人久久综合热| 日本午夜片成年www| 久久精品国产国产| 2020天堂中文字幕一区在线观| 97国内免费久久久久久久久久| 日本视频网站在线www色| 久久国产精品自由自在| 欧美精品在线免费| 91制片厂制作果冻传媒破解版| 欧洲成人r片在线观看| freexxx性欧美孕交孕妇| 久久99热精品免费观看动漫| 男女在线视频| 大柠檬导航香蕉导航巨人导航| a级黄色毛片三个搞一| 麻豆精品在线视频| 成人欧美一区二区三区视频xxx| 69热视频在线观看免费自拍| xxxx日本护士人妖| 欧美一级看片a免费观看| 日本特黄aaaaaaa大片| 玉婷小说系列1一17h| 日韩精品中文字幕一区三区| 99热这里只有精品在在| 欧美一及| 免费国产成人高清在线观看不卡| 欧美日韩精品一区二区| 男人躁女人躁的好爽免费视频| 在线视频1卡二卡三卡| 伊人俺去久久涩五月综合| 在线国产日韩|