Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4545

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 午夜狠狠干 | 日韩福利视频导航 | 欧美高清一区二区三区欧美 | 欧美日韩中文亚洲另类春色 | 天天艹天天 | japanoldman老头同性 | 日韩亚洲欧美在线com91tv | 一二三四视频社区在线1 | 欧美精品一区二区三区在线 | 波多野结衣教师中文字幕 | chinese武警gay男同 | 日本www色视频 | 青青青草视频 | 老师我要别停用力 深一点 老师您的兔子好软水好多动漫视频 | 免费观看欧美一级片 | 婷婷综合久久狠狠色99h | 日韩欧美亚洲乱码中文字幕 | 欧美在线视频看看 | 久草色在线 | 日本xxxwww在线观看免费 | 欧美一区二区福利视频 | 亚洲二区视频 | 日日摸人人拍人人澡 | 最新国产精品精品视频 | 日本高清乱码中文字幕 | 污免费视频 | 日韩观看 | 久久99精品美女网站色夜夜嗨 | 日韩不卡一区二区 | 日本免费看视频 | 日韩在线视频网 | 日日操狠狠干 | 扒开美女下面粉嫩粉嫩冒白浆 | 五月婷婷影视 | 日韩免费播放 | 久久久久久九九 | 午夜老司机在线观看 | 日韩综合在线视频 | 亚洲国产精品免费在线观看 | 日本高清在线观看 | 办公室激情第二季波多野结衣 |