Large Steel Sliding Installation Technology of

Time:[2016-3-23]  Hits:3831

Large Steel Sliding Installation Technology of


1. Guangzhou Steel Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Guangzhou Steel Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of Guangzhou Steel construction program
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Guangzhou Steel Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本女人毛茸茸| 老师穿白丝袜用脚指甲我好爽| 久久精品国产线看观看亚洲| 欧美日韩一区二区在线| 99草在线观看| 久久www免费人成高清| 日韩伊人| 中文字幕色婷婷在线视频| 欧美一区二区三区在线| 欧美高清360| 久操免费在线视频| 成年人免费看视频| 俺去在线| 一级录像免费录像在线观看| 136樱桃福利视频导航| julia ann与黑人| 日韩免费一区二区三区在线| 99热在线观看| 班长胸好大下面好紧h| 欧美5g影院天天爽天天看| 久久久久国产精品美女毛片| 久草综合在线| 免费看久久| 在线精品91青草国产在线观看| 欲之国太子双性h文| 九色腾只为高清而生| 91精品国产综合久久青草| caoporn免费| chinefree普通话对白| 一级生性活片免费视频 影片| 在线播影院理论片| 动漫美女吸乳羞羞| 麻豆国产精品高中生视频| 欧美日韩亚洲天堂| 欧美另类丰满熟扫乱xxxxx| 久久99热只有频精品6不卡| 青青青青久在线观看视频| 高清精品一区二区三区一区| 亚洲综合插插| 久久99热精品这里久久精品| 99视频免费高清完整版|