Guangzhou Steel curtain wall construction and process all-glass structures

Time:[2016-4-9]  Hits:3847

Guangzhou Steel curtain wall construction and process all-glass structures

 

 

Installation of Guangzhou Steel full glass curtain wall is more than one joint construction trades, a very complex process, and the operation also requires very fine, requires teamwork team. But it also has a close relationship with the construction schedule of other sub-projects. To make the construction and installation of steel curtain wall smoothly, the project must be based on the actual situation, compile the individual construction organization design, and confirmed by the general contracting unit.

Project started preparatory work
Technical data collection

On-site data collection and civil design of civil structure size measurements. Because there may be some fluctuation civil construction, the actual size is not always in line with the design drawings. Full glass curtain wall on the civil structures related to the higher size requirements. So before the site must be designed to measure, obtain first-hand information and data. And then to draw the curtain separating practical view of the requirements of owners. For door entrance of the site, also must make automatic revolving door, full glass door unit with the glass curtain wall on the door and the door of a reliable shut. But also need to meet requirements for the installation and maintenance of automatic revolving door.

Design and construction plan was finalized

Design and construction plan was finalized. When glass curtain wall design partition, in addition to considering a uniform aesthetic appearance, it should also be taken to minimize the glass specification models. Because all kinds of outdoor architectural design are not the same, to have a large outdoor canopy, driving ramps and other projects, more attention should coordinate the overall construction schedule and order and prevent the construction and other outdoor facilities, the impact of walking crane and glass curtain wall installation. Before the formal construction, but also to deal with the scope of the construction site be flattened infill, good site clean-up, to ensure the smooth running crane.

Prepare materials and mechanical equipment
The main material quality inspection

(1) glass sizes are correct, with particular attention to check the glass during storage and transportation process, whether the damage found to have cracks, chipping the glass must not be installed, and shall immediately notify the reprocessing plant supplement soon as possible.

Material (2) structural metal member meets the design requirements, whether straight member, processed size, accuracy, hole location meets the design requirements. Good anti-rust paint to brush first, to all the member number clearly marked.

 

The main construction equipment inspection

(1) glass lifting and transportation machinery and equipment inspection, especially for crane operating system and electric chuck performance checks.

(2) Check the performance of a variety of power and hand tools.

(3) embedded parts location and design of the position deviation should not exceed 20mm.

Scaffolding

Due to the different needs of the construction program, construction scaffolding structures must meet different requirements.

(1) discharge line and production load-bearing steel frame, should be set up on both sides of the glass curtain wall surface, to facilitate workers, such as welding and installation work at different positions.

(2) When installing the glass curtain wall should be built on the inside of the curtain wall. To facilitate the lifting obliquely inserted into the glass does not touch the scaffolding, but also make the upper and lower parts of the standing scaffolding workers can easily hold the hand sucker can assist crane glass exact place.

(3) the glass in place after dispensing and cleaning phase, then the need to build a separate row in the outdoor scaffolding, due to the large area of ​​continuous full glass curtain wall, unable to communicate with the outdoor scaffolding then pull the main structure, so pay special attention to the scaffolding support and stable, can land anchors, rope and pull with a bracing strut connection. Construction of each operation to be laying layer height scaffold boards, have a top rail, scaffold boards use wire fixation. In the construction and dismantling of the scaffolding to be extra careful not to throw down throw and steel fasteners from a height, to prevent damage to the glass.

 

Guangzhou Steel curtain wall installation
Guangzhou Steel curtain wall installation steps roughly as follows:

1. actinomycetes positioning;

2. The upper portion of the load-bearing steel structure installation;

3. The lower portion of the side frame and installation;

4. glass in place.

5. Note sealant;

6. Surface cleaning and inspection;

Maintenance and repair
At present, all-glass curtain wall maintenance and repair of the owners have not been enough attention. Now full glass curtain wall material used has a certain validity period should be observed regularly and maintained in normal use, so after Labor Exchange acceptance, and use of best developed curtain wall maintenance and repair program, and signed a contract with the company.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 又长又大又粗又硬3p免费视| 久国产精品视频| 美国禁欲3护士| 99re9精品视频在线| 色老头久久久久久久久久| 人人人免费人人专区人人| 成人综合在线视频| 美女操大逼| www二十四小时在线观看视频| 欧派卫浴第一集| 动漫美女下体阴部漫画| 久久久久美女| 麻豆观看| 欧洲美妇做爰| 尤物在线免费视频| ai换脸女明星被躁在线观看免费| 99香蕉视频| 日韩中文在线观看| 日韩国产欧美一区二区三区在线| 久久久久久亚洲精品不卡| 一级做人爱a视频正版免费| 一个人看www在线视频资源| 欧美日韩一区二区三区在线| chinesevideos原创麻豆| 91视频中文字幕| 久久国产精品免费观看| 99精品国产一区二区三区| 欧美最猛性xxxxx图片| 成年女人免费视频播放77777| 曰批视频免费40分钟野战| 久久精品二三区| 99在线看| cls区全新地址t66t| fc2人气在线观看| 91精品人成在线观看| 久久国产精品99精品国产987| 动漫同性女被吸乳羞羞漫画| 嘛豆传媒国产剧情| 男人的视频天堂| 前田由美加勒比在线播放| 亚洲中字幕永久在线观看|