Foshan main steel members (b)

Time:[2016-5-14]  Hits:5289

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久99精品国产自在现线小黄鸭 | 日日干干夜夜 | 亚洲国产欧美在线 | 啊用力太猛了啊好深视频免费 | 日韩一区二区不卡 | 在线视频 成人 | 免费揄拍成人国产精品视频 | 白桃小说 | 日韩在线不卡 | 一级人做人a爰免费视频 | 日韩有码第一页 | 中文字幕视频在线 | 99九九热 | 聚会的目的在线观看 | 日韩爱| 在线看国产视频 | 欧美精品v国产精品v | 男女在线视频 | 日韩精品欧美一区二区三区 | 男女性生活黄色片 | 日本不卡视频一区二区 | 青青青爽国产在线视频 | 欧美亚洲欧美日韩中文二区 | 五月婷婷伊人 | 天天做爽夜夜做爽 | 高h肉辣文交换 | 一本大道在线观看 | 日本香蕉一区二区在线观看 | 尤物校花闺蜜呻吟 | 青青草原在线免费观看视频 | 春色www在线视频观看 | 四虎永久在线日韩精品观看 | 中文国产成人精品久久无广告 | 日本人伦一区二区三区 | 欧美videos粗暴老头 | poren日本| 欧美一区二区三区免费 | 91片| 日日av | 日本免费观看网站 | 日本久久高清视频 |