国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > How to project the amount of drawings and Attention
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

How to project the amount of drawings and Attention

Time:[2016-5-28]  Hits:5033

How Grilled quantities and drawings should be aware of the problem
    First, do not be afraid, do not be intimidated by drawing a thick, steel sheet Foshan actually very simple, as long as you get down to seriously look at and easy to follow, but the first not to rush to get the drawing to pick up the drawings Pa map, I think first of all to see throughout the drawings are completely and see what you want to dig up some of the drawings is what is the pipe gallery, frames, ladders, etc., carefully look at the requirements of technical description of the drawings, there is every a marked, throughout the drawings to see if and where do not understand, you want to look around carefully in conjunction with, until understand this. Understand the future, do not rush to dig up map, to look at the drawings to be grilled specified node maps, to know what is the column strong axis, what is the weak axis of column, beam and read beam convergence, convergence of beams and columns combination node graph, also known as clear in some detail, such as cantilever: at one end of the beam and the column or beam steel pick, and the other end with the hinge beam, beam type / FL, then indicate left steel, beam type / FR indicating right steel pick. Draft requirements Grilled drawing quantities must be clear, to prepare for the future to know how the investigation was initially counted, not the same subheading in the draft must be clearly labeled, such as the amount of which is the framework for some, the amount of which is a joint platform some, as well as the draft of the type of steel Q235B, Q345B distinction must understand.
The following can be sequentially by number of drawings to Pa map, although it is a sequence diagram a steak, but when combined with grilled FIG also around, and do not count and do not count re-exposed. Beam Elevation in accounting do not have a fixed plan elevation drawings on, because the more intuitive in the accounting plan, the elevation in the count if in the accounting of weight, and in some elevation in elevation beam no details the plan, then the elevation to its accounting quantities, as everything is a plan view elevation 10m, 20m, 30m, 12m elevation and elevation there, and to its accounting quantities, but to pay attention to some details of the small platform there is no such level, this level do not have accounted for its engineering capacity in elevation, the small platform in the future plan in its accounting of quantities can be, in the accounting plan was relatively simple and intuitive and is not exposed. There is no plan in the accounting quantities cantilever bracing, so in elevation in accounting to project the amount of cantilever bracing.
When accounting plan is best not to be considered a plan even if the level of the ladder all the elevation, so easy to calculate weight and more trouble, for example, you forget this layer count ladder when the plane 10m of elevation, to the elevation of 20m layer also forget this layer ladder, then the ladder counted two most likely from 10m on 20m or 20m at 10m ladder ladder, two ladder is actually a ladder. After another count isochronous engineering, unified calculation ladders, so can not go to the same elevation rate test, not easy to count heavy dew is not easy to count, and to count the number of different ladder, there can be calculated the same quantities of a ladder, just after the number is multiplied by a ladder on it, and has been able to come up with a detailed accounting of the ladder after ladder, to avoid the accounting of a ladder to find a detail, counted after the close up the next count a ladder looking ladder detail, so can greatly improve the efficiency and accuracy of accounting.
When the length of the accounting column to pay attention to the column foot elevation, but also the thickness of the floor and lose column capitals plate column base plate thickness can be seen from the drawing, but no detailed drawings in capitals plate thickness, not the same column capitals have different thickness plate, the thickness from the junction diagram can be found. Foshan is steel gusset accounting accounting quantities in a difficult, so before accounting gusset plates must be read carefully to count the node in the node graph board. When accounting gusset plates, if rectangular gusset plates are not regular, and most graphically longest side broadside in a rectangular area of ​​accounting, to identify what kind of steel beam is then, what is hinged beam, not the same beam the corresponding bearing beam is not the same node board are not the same, so the accounting node board also pay attention to the type of bearing beams corresponding, when the node node combination accounting board to be careful not to count the weight, but also the column node graph to distinguish between the top and the middle of the column to count, and the two beams at a height greater than 50 and less than 50 nodes map is not the same, should pay attention to distinguish to count.
It means the accounting quantities in some special way it works amount calculated manufacturing apparatus, such as when the accounting sector platform engineering, the way to its size and the number of manufacturing required angle ring mold calculated to prevent re looking for trouble in the future. End count all quantities can be based on standardized after accounting the number required over the probe H-beam, based on technical accounting measures Foshan steel erection reinforcement weight.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 液体灌装机_全自动灌装机_大桶灌装机_200L灌装机_涂料油漆灌装机-昆山灌装自动化设备有限公司 | 推拉雨棚,防雨棚,遮阳遮雨棚,伸缩雨棚,移动雨棚,电动雨棚,雨棚制作厂家 - 山东创力篷业 | 江西省屹诚建筑装饰工程有限公司 | 塑料植草格_停车场植草格_消防车道植草格厂家_山东朋联建材 | 生物除臭箱,玻璃钢拱形盖板_厂家_价格-河北润达环保设备有限公司 | 上海vi设计公司_logo设计_包装设计_品牌定位策划公司-焕识品牌设计 - | 专注客流统计,客流分析,人流统计系统,客流计数器-广州市天威电子科技有限公司 | 耐磨钢板_复合耐磨板_KN60耐磨钢板-北京耐默公司 | 深圳市佳顺优印印刷有限公司,佳顺优印,画册印刷,海报印刷,封套印刷,手提袋印刷,包装盒印刷,彩盒印刷,无碳纸印刷,不干胶印刷,信封印刷,便笺印刷,笔记本印刷,台历印刷,挂历印刷,国际会展中心附近印刷厂,宝安印刷厂,宝安教材印刷厂 | 碳纤维棒_碳纤维管_碳纤维缠绕管_嘉兴恒隆复合材料有限公司 | 皮革耐折试验机-消字率测试仪-面具全视野测试仪-东莞市誉扬检测仪器有限公司 | 长沙广告设计公司|长沙广告制作|湖南户外广告制作|商业美陈就找湖南盛翔文化传媒有限公司老品牌高品质 | 耐磨锤头|合金锤头|高铬耐磨锤头|破碎机锤头|双金属双液复合锤头_巩义东辰实业 合金耐磨锤头铸造厂 | 溶气气浮机_一体化净水设备_污水处理设备_mbr一体化污水处理设备-明基环保 | 上海物业管理_写字楼物业管理_厂房物业管理_上海企福物业管理有限公司 | 扬州华工电气有限公司|环氧树脂管|金刚石绝缘板|U型绝缘槽|电解槽绝缘材料 | 中国江苏国际经济技术合作集团有限公司-致力于做大做强国际工程、国内工程、国际贸易和城镇投资 中国建材信息总网-中国建材行业权威的信息资讯平台 | 深圳喜运达物流官网_东南亚物流|海运|专线|海外仓_泰国菲律宾马来西亚海运|物流专线|海外仓 | 上海企业团建|上海团建|上海团建活动|上海拓展培训|上海拓展训练|傲朗企业管理顾问(上海)有限公司 | 江门市东信科技 - 江门小程序开发,江门网站制作,江门软件开发,江门app开发 | 专业的展会信息服务平台 - 展加 专题秀_汇聚网络热门专题_实时报道各类新闻专题资讯 | 萘系减水剂|缓凝|早强|聚羧酸|混凝土|石膏板|管桩减水剂厂家-潍坊英宏建材有限公司 | 转炉烟道,转炉汽化冷却烟道,转炉汽化烟道,汽化冷却烟道系统生产厂家-宏发制造集团有限公司原河北宏发机械有限公司 | 耐磨锤头|合金锤头|高铬耐磨锤头|破碎机锤头|双金属双液复合锤头_巩义东辰实业 合金耐磨锤头铸造厂 | 希希助培是专业的教育信息化全场景服务商,为教育培训机构提供教务管理、招生营销、财务管理、家校互动等 | 临沂人才网_临沂招聘网_【官方网站】| 桁架楼承板_钢筋桁架楼承板厂家-山东新材料科技 | 山东凯达起重机械有限公司-单梁行车,龙门吊,提梁机,门式起重机,悬臂起重机 | 立式离心泵_不锈钢自吸泵_液下泵_变频无负压供水设备-大东海泵业无锡有限公司 | 无线计量仪表-电力物联网仪表-CE认证电表| 首页|广东蒙泰高新纤维股份有限公司|丙纶细旦丝|丙纶异形丝|丙纶FDY网络丝 - 广东蒙泰高新纤维股份有限公司 | 桥梁养护|桥梁维修加固|隧道裂缝修补|支座更换|管道堵水气囊|衡水众拓路桥养护有限公司 | 永康微网站建设、永康手机网站建设、永康营销型网站建设、永康外贸网站建设、永康网站托管、永康网络公司—英汇网络 - 永康市英汇网络技术有限公司 | 呼吸家官网|肺功能检测仪生产厂家|国产肺功能仪知名品牌|肺功能检测仪|肺功能测试仪|婴幼儿肺功能仪|弥散残气肺功能仪|肺功能测试系统|广州红象医疗科技有限公司|便携式肺功能仪|大肺功能仪|呼吸康复一体机|儿童肺功能仪|肺活量计|医用简易肺功能仪|呼吸康复系统|肺功能仪|弥散肺功能仪(大肺)|便携式肺功能检测仪|肺康复|呼吸肌力测定肺功能仪|肺功能测定仪|呼吸神经肌肉刺激仪|便携式肺功能 | 上海物流公司_上海冷链运输_空运_电商仓储配送电话-迈泽物流 | 深圳LED显示屏厂家_室内户外LED显示屏_彩屏电子有限公司 | 扭矩测试仪_拉力测试仪_扭力扳手测试仪_测试台-上海铸衡电子科技有限公司 | 郑州润滑油展-第16届中国润滑油、脂及汽车养护展览会-2025年5月27-28日-郑州国际会展中心 | 转盘萃取塔,DMF回收塔生产厂家-无锡弘鼎华化工设备有限公司 | 洗地机,洗地机价格,扫地机,工业吸尘器,手推式洗地机,驾驶式洗地机,北京洗地机【北京高美环保科技有限公司】 | 锯轨机|气动锯轨机|内燃锯轨机|电动钢轨钻孔机|内燃钢轨钻孔机-山东卓力铁路设备有限公司 |