Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4482

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 尹人成人网| ssswww日本免费网站片| 日韩精品在线免费观看| 成人精品视频在线观看| 色久综合大榴莲| 一个人www在线高清观看| 女友闺蜜真湿夹得我好爽小说| 欧美在线精品一区二区三区| 欧美一区二区三区在线播放| 放牛老汉与老头 恋老小说| 高清成人影院| 久草网在线| 日韩成人中文字幕| vr专区精品中文字幕| 女人做爰视频人免费| 99亚洲精品视频| 美女脱裤子让男生摸屁屁| 99v视频国产在线观看免费| 久久99精品免费视频| 波多野结衣中文字幕在线观看| 欧美成人交tv免费观看| 16欧美freesex呦交hd| 那个男人的记忆法韩剧在线观看| 69日本xxxxxxxxx29| 欧美α片无限看在线观看免费| a大片大片网y| 欧美在线看欧美高清视频免费| 69av在线| 久久中文字幕一区二区三区| aaa级毛片| 看一天影院 理论片| 成人网18免费网站在线| 医生在线询问免费| 久久国产影视免费精品| 成人福利在线免费观看| 欧美极品alettaocean高清| 日韩毛片大全| 久久精品这里是免费国产| 男人扒开女人的腿猛进这猛出| 欧美一级特黄aaaaaa在线看片| 久久精品五月天|