国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Foshan three steel steel truss construction method
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4923

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 中文字幕视频免费在线观看 | 亚洲国产影院 | 一级@片 | 亚洲色域网 | 纵情免费阅读 | 一级成人毛片免费观看 | 男女乱淫 | 中国国产一级毛片视频 | 四虎国产精品影库永久免费 | 四虎影视在线影院在线观看 | 久热中文 | 亚洲青青草原 | 青青草国产免费国产 | 欧美福利视频 | 美女打开双腿扒开屁股男生 | 办公室揉捏老师调教h | 久久精品热 | 欧美多人疯狂性战派对 | 欧美一区网站 | 久久这里只有精品18 | 日韩中文字幕在线免费观看 | 字母圈调教视频 | 最新香蕉97超级碰碰碰碰碰久 | 天天躁夜夜躁狠狠躁躁 | 亚洲 欧美 国产另类首页 | 久久涩| 天天干天| 成 人 黄 色 小说免费观看极 | 午夜影院在线 | 一二三四日本动漫在线观看视频 | 成年男女免费视频网站播放 | 天天干天天干天天干 | 四虎亚洲 | 深夜视频在线观看免费 | 欧美深夜影院 | 一二三四视频社区在线7二 一二三四视频免费观看高清版在线 | 亚洲一级大黄大色毛片 | 天天澡天天碰天天狠伊人五月 | 日本女人bbb | 特级淫片欧美高清视频蜜桃 | 一级强老师女学生 |