Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4482

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 成人嘿嘿羞羞啪啪漫画| 在线一本| 美女在线视频观看影院免费天天看| 男人猛躁女人下部视频| 男人桶女人| 在线欧美视频免费观看国产| 农村妇女野外交性高清片印度| h成年同人动漫在线观看网站| 欧美亚洲国产日韩一区二区三区| 日韩极品视频| 男女尻逼| 日韩一区二区在线观看| 日韩国产精品99久久久久久| 欧美最新brazzers| 欧美一级片播放| 草bwbwbwbwbw| 美女洗澡露出胸膛光屁屁| 蜜桃视频m3u8在线观看| 美女脱了内裤露出尿囗无遮挡| 中文有码在线观看| 日本最新男男gayjapanhd| 绿巨人www在线观看| 欧美国产一区二区三区| 91九色在线播放| 麻豆免费高清无砖码区| 宅男影院在线观看| 欧美日韩不卡一区| 欧美日韩中文一区| 91porny在线| chinese男男gay吴小瑞| 欧美一区=区三区| 高清欧美日本视频免费观看| 白丝的诱惑| 久久中文字幕一区二区三区| chinesegay军人ⅹxx| 久久国产视频网| 成人免费在线观看视频| 催眠性指导ova| 日本特级淫片免费看| 肉体秘书hd中文字幕| 嫩草影院久久国产精品|