Analysis on Difficulties and Safety Precautions of Foshan Steel Structure Sandwich Construction

Time:[2017-1-4]  Hits:4809

Sandwich construction site in Foshan steel is often a small space, the main beam is difficult to enter, even after disconnection in the outside into the connection, the machine is not easy to use, hand-lift carry stitching after lifting.

1, take root
   Sandwich safety is one of the key "rooting", the so-called root is the new mezzanine roof load through the main beam radiation to the root, from the root spread to the original structure, like a tree without a strong root tree can not stand.

In the actual construction of the first to detect the media hardness. thickness. Reinforcement, etc., try not to interrupt the main hole when the hole, in strict accordance with the requirements of the depth of the process, diameter hole, according to the roof load configuration bolt. In the anchor must be cleared before the hole, otherwise it will seriously affect the anchorage strength, implant speed can not be too fast can cause drug mixing is not complete, too slow will cause running drugs, will reduce the pull force, after implantation According to the temperature before waiting for construction.

According to the total radiation of the main beam, the thickness and area of ​​the anchor plate are calculated. (The value of the anchor bar is higher than that of the high strength bolts, and the success rate of the reinforcing bar is low.) Of the reason) welding pallets or connecting plate to be split welding.

Installation of the anchor bolt to pull the experiment, the shear force can be carried out on the soil experiment, all anchor plate drilling hole to consider when the situation, can play less equipment, but not less than the design load. If the anchor plate and concrete beams or concrete columns can be gap between the filling or grouting material processing, all the anchor after solidification before loading the main beam.

2, the main beam

The main beam in the sandwich project is the safety key to the second, if a tree even the roots of the tree can no longer withstand external force is also in vain, the choice of the main beam and roof load, span is directly related to the span if you can choose small Cutting, primer and other treatment, to the site after the measurement of both ends of the anchor in the fine-cutting, sandwich works and other steel works is different from the majority of the beam purlin of the beam, or the H-beam steel beam to be polished, Because the box beam must be welded, high cost, weight, hoisting and transportation difficulties, the end of the attic mezzanine construction, the size of the structure of the beam, the length of the length of the indefinite length, so the measured after cutting, if the span of small to try to use steel,

3, connection

Foshan steel construction is the main steel beam connection, 1 welding, 2 high-strength bolted connection. In large projects generally use high-strength bolted or welded, because the venue and welding power to allow this is not to say, in the mezzanine site is often a small space, the main beam is difficult to enter, even after disconnection into the connection, mechanical easy to use Not on hand-lift carry stitching after lifting steel beam connection.

Foshan steel construction safety measures:

(1) construction operations should comply with safety operating procedures, must enter the scene with a helmet, smoking to the development of the smoking room, high-altitude operation of a good seat belt. To establish a prevention-oriented security awareness.

(2) check fire, fence and other safety facilities are perfect, imperfect to be trimmed or added.

(3) should be promptly cleaned up a variety of roads and roads of snow and ice, pay attention to anti-slip fall. Can not be promptly removed due to the laying of straw, wood and other non-slip measures.

(4) sand electric heating pipe should be taken to protect the grounding measures to prevent leakage.

(5) open fire should be away from combustible materials, or to take isolation measures. Strict implementation of the use of fire card system. And carry fire bucket, set up to see the fire.

(6) to protect the safety of workers, dormitory is prohibited within the electric furnace or other dangerous electrical heating equipment.

(7) to prevent frostbite in winter facilities, or gas poisoning incidents.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 鲁大师7视频在线观看| 触手调教| 久久99国产精品成人欧美| 女教师pooping小便a| 免费一级毛片视频| 91p0rny九色| blue在线观看视频全集资源| 91麻豆精品国产剧情| 中文字幕在线看片成人| 免费观看久久| 日韩在线一区二区三区视频| 欧美一级第一免费高清| 老师办公室里做好紧好爽| kkkk4444在线| 1024久久| 日韩美女黄大片在线观看| 高清在线观看自拍视频| 欧美壮熊| 啊用力太猛了啊好深视频免费| 美女毛片在线观看| ticklevk白小冰的视频vk| 九九热精品免费观看| 日韩福利片| www.中文字幕在线| 美女水多多| 一天能看三次的含羞草传媒| 青草社区在线观看| 久久机热re这里只有精品15| 欧美黑人巨大硬xxx猛性| 久久996| 成人午夜大片免费7777| 岳肥腚大乳| 久久久久久免费一区二区三区| 91在线视频网址| 99热99re8国产在线播放| 中文字幕adn—296篠田| 久久99er热精品免费播2018| 2020国产免费久久精品99| 91综合在线| 免费一级毛片在线观看| 99这里只精品热在线获取|