Steel structure workshop

Time:[2020-8-31]  Hits:3828

Transfer around the industrial park, you will find that many workshops have the impression of high, large and wide steel structure workshops. Most of the modern industrial workshops adopt the steel structure housing mode, which is better than the traditional brick and concrete building.

 

 


Steel structure workshop construction process steps

 

1.Land use permit. No matter at home or abroad, the first step of building workshop is to verify the land use right to ensure the legitimacy of housing construction.

 

2.Investigate the surrounding environment,topography and other factors, and communicate with customers to determine the preliminary design plan.

 

3.After the drawing is confirmed, the factory will arrange production. The whole production process is carried out on the industrial assembly line to ensure the unity of the steel structure and the quality of each part.

 

4.The processed steel structure will be transported to the construction site for erection, installation and final decoration. This "production build" construction mode greatly shortens the construction period, reduces the construction period and labor cost; in addition, it also reduces the construction waste on the construction site, which is in line with the social pursuit of energy conservation and environmental protection in modern life.

 

5.After the completion of construction, it will enter the final acceptance process. The relevant quality supervision department will carry out the construction acceptance of the steel structure workshop house, and finally carry out the delivery stage. From the above five links, it can be seen that the steel structure factory workshop has the advantages of "saving labor, saving money and heart, safety and environmental protection", and has become the preferred product for the construction of factories, warehouses, office buildings, gymnasiums, aircraft hangars, etc.

 

 

Quality problems are easy to occur in the process of processing and manufacturing, and it is difficult to deal with them after the occurrence of quality problems. The proportion of general process quality problems is very small.

 

Welding process

 

This process belongs to concealed engineering, and it is also one of the processes prone to quality problems. According to the statistics of product quality report of a company in 2004, the repair rate of welding seam caused by welding quality is as high as more than 80%, followed by the improper operation of the previous procedure and the technical problems of operators, accounting for about 10% It is the main problem that directly affects the quality of the project. Therefore, this type of problem must be detected and judged by professional testing company using professional testing tools. Generally, according to the type of defects in the weld, it can be divided into slag inclusion, undissolved, porosity, etc.

 

 

Painting process

 

This process is also a hidden process, the impact on the structure is less than the impact on the building function. It is also a process prone to quality problems. The quality problems of the process are mainly as follows: the paint film on the surface of the component falls off in large area and local area; the paint film on the surface of the component falls off and sags; the thickness of the paint film is not enough; the distribution of the film thickness is uneven; and the color difference of the paint film is large.

 

Assembly process

 

This process plays an important role in the quality of component processing, and its quality is greatly affected by the previous process, so it is very important to strengthen process monitoring before assembly. Generation of the process The main quality problems are as follows: the position of the assembled parts is wrong, for example, the assembly of 3450 mm is 4350 mm; the use of the parts is wrong, which should have been assembled with 2 pieces of parts, but the assembly of 3 parts; the assembly errors of parts in the correct position, such as the hole 45mm on the board originally faces outward, but the actual 45mm is installed inward; the assembly clearance of the assembled parts exceeds the specifications and technical documents Some parts are assembled without correction, and the existing deformation can not be eliminated after assembly; the operator cut privately for the convenience of the drawing, resulting in the size of the hole on the part exceeding the standard; the surface treatment of the welding area is not carried out; the assembly error is caused by the wrong size of the drawing paper.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲a在线观看 | 三级性生活片 | 日韩爱爱小视频 | 伦理影院在线观看 | 性久久久久久久 | 日韩午夜在线视频不卡片 | 伊伊成人网 | 日本不卡免费新一二三区 | 欧美在线观看第一页 | 天天爱天天做天天爽夜夜揉 | 免费成人在线播放 | 女校生电车痴汉侵犯在线观看 | 五月天婷婷伊人 | 99国产精品国产精品 | 亚洲操图| 濑亚美莉大战黑人在线观看 | 欧美亚洲人成网站在线观看刚交 | 在线免费国产 | 又大又硬又爽免费视频 | 一本dao| 美女美女高清毛片视频 | 正在播放麻豆 | 五月一区二区久久综合天堂 | 图片区 日韩 欧美 亚洲 | 亚洲欧美日韩第一页 | 香蕉视频久久久 | 欧美性色黄大片四虎影视 | 午夜影院在线视频 | 一级毛片在线免费观看 | 日韩一级片在线免费观看 | 青青青青在线视频 | 聚会的目的在线观看 | 永久黄网站色视频免费观看99 | 一本到视频在线观看 | 91次元黄色观看 | 欧美成人精品一区二区三区 | 美女在线视频观看影院免费天天看 | 日本高清在线一区二区三区 | 成在线人永久免费播放视频 | 高大肥臀老妇满足我小说 | 午夜视频在线观看完整高清在线 |