国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Cost control in the design stage of steel structure building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:2991

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: ts丝袜绿帽丨vk视频| 成人网18免费下| 欧美三级一区二区三区| 暖暖的高清免费中文| 欧美三级一区二区三区| 宅男撸66首页在线观看| xxx波多野结衣xxxm| 在线看免费观看视频网站大全| 综合色亚洲| 九色备用| 免费看w片的网站在线看| 欧美日韩国产在线成人网| 俄罗斯xxxxxbbbbbb极品| 99精品一区二区三区| 欧美大胆一级视频| 日本中文字幕在线观看| 成人亚洲国产精品久久| 2021国产成人精品国产| 超h 高h 污肉1v1快穿| 男人私人影院免费看视频| 亚洲综合色播| 伦理免费在线观看| 尤物777tv在线进入| 日韩一级片免费看| 色酷视频| 2019天天操夜夜操| 99久久国产免费福利| 猫咪官方最新版网址| 大陆老头xxxxxhd| 成人免费一级毛片在线播放视频| 风间由美jux236在线播放| 欧美绿岛| 一日本道加勒比高清一二三| 看一级特黄a大片国产| 久久亚洲国产午夜精品理论片| 欧美在线看欧美高清视频免费| 男人的天堂视频在线观看| 久久机热这里只有精品33| 免费大香伊蕉在人线国产| 久草福利资源| 一个人bd视频全免费|