国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Cost control in the design stage of steel structure building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:2991

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 扒开小雪让你一次看个够| 久久99国产精品成人欧美| 成人高清在线观看播放| 免费看一级片| 一本首大综合a8| 最新毛片网| 92精品国产自产在线| 中文字幕日本一区久久| 法国性迷宫dvd| 欧美a视频| 91成人午夜精品福利院在线观看| 免费看逼网站| 91夜色| 自拍偷拍片| 15b0ys青年同志69gay| 欧美日韩综合高清一区二区| 91久久国产综合精品女同国语| 青青热久久国产久精品| 看中国国产一级毛片真人视频| 久久99网站| free性张柏芝| chinese调教| 日韩一级片视频| 久久国内免费视频| 日本宅男午夜免费永久网站| 欧美呜巴又大粗又长| 色久悠悠在线观看| 久久一区精品| 在线观看国产日本| 91运势网| 久草久草久草久草| 一个人在线观看www免费视频| 被当成泄欲工具粗暴的对待小说| 97影院97伦里片| 99视频国产精品| 久久精品男人的天堂| 久久精品人人爽人人爽快| 欧美一级片网站| 日本dvd碟片高清免费| 一个人bd视频全免费| 三级黄线在线播放免费|