国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.lhp8.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:2884

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: ai造梦自带套赵露思| 乱人伦在线资源中文字幕| 2021一卡2卡三卡4卡乱码不卡| 91精品国产乱码久久久久久| 日本性xx| 毛片网站免费在线观看| 久久se精品一区二区影院| 男女啪啪猛烈免费网站| 单身男女1在线观看免费完整版| 白丝爆漫画羞羞动漫| foot女王脚奴vk视频| 欧美日韩 国产区 在线观看| 久草福利视频| 男人叉女人| 96精品视频在线观看播放| jizz老师| 美国豪放女大兵在线观看| 魅惑乙女在线观看| 男人扒开美女屁股的网站| 女仆~淫辱の教室动漫在线观看| 奇米影视一区二区三区| 一级毛片免费视频网站| 男人网站在线观看| 久久香蕉精品视频| 男女xxoo做爰猛烈gif| 879影视动漫h免费观看| 毛片1| 动漫淫图| 青青青久97在线观看香蕉| 68日本xxxxxxxxx59| 91桃色成人免费| 久久99er热精品免费播2018| 操穴网| 97国产大学生情侣11在线视频| 91无限数破解版入口| 99久久精品男女性高爱| 91香蕉国产亚洲一区二区三区| 免费国产怡红院在线观看| 最新日韩| 99精品在线观看| juliaann大战四个黑人|