Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:2670

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 色花堂98| 91色老99久久九九爱精品| 不卡一区二区在线观看| 欧美日韩视频精品一区二区| xxx在线| 伊人蕉久| v天堂中文在线| 公和熄洗澡三级在线观看| 91精品国产91久久久久久最新| 久久99精品综合国产首页| 撸撸射影院| 欧美成人h在线观看完整版| 99成人在线观看| 女主插足当小三的heh| 日韩国产免费一区二区三区| 亲爱的客栈第一季| 最新老头与老头同性视频| 美女脱裤子让男生摸屁屁| 久久久久久免费视频| 九九久久精品综合九九爱热| 一个人www在线高清观看| 91国内外精品自在线播放| 97色伦图片97综合影院| 中国一级特黄真人毛片免| 久久国产精品久久精| 怡红院男人的天堂| 男女乱淫| 一道本香蕉视频| 911制片厂麻豆| 日本精品一在线观看视频| 成人靠逼| 免费影院在线| 日本在线观看一级高清片| nanana最新在线视频免费观看网| 2021国产成人精品国产| 糙汉文多肉ivi年龄差| 欧美激情综合亚洲五月蜜桃| 99综合久久| 在线精品国精品国产不卡| ass芬兰大白屁股pic| аⅴ天堂一区视频在线观看|