Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:2670

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 最新男同志gayxxx男男| 日久精品不卡一区二区| 8x成人| 99热国产这里只有精品免费| 乱码卡一卡二卡新区在线| 美女被叉叉的影院| 老太婆娇喘呻吟| 成年大片免费播放视频人| 日本午夜精品一本在线观看| 秋霞网午夜| 免费超爽大片黄网站| 大学生粉嫩无套流白浆嗯啊| 一区二区三区视频在线观看| 色吊丝永久在线观看最新| 成人在线观看国产| 9277免费视频观看| 久久这里只有精品视频在线视频15| www.99在线| 99视频精品全部免费免费观| 嗯啊轻点视频在线观看| 九九视频这里只有精品99| 成人手机视频在线观看| chineseold man恋老年| 一级毛片免费观看不收费| 免费中国一级啪啪片| 日本中文不卡| 嗯啊你轻点好深啊hh在线播放| 青草青99久久99九九99九九九| 一区二区三区国产精品| 久久精品免费视频6| 日韩欧美国产高清在线观看| 日本性视频网站| 美国av| 日日操影院| 男人使劲躁女人过程| 情趣白丝女仆下部被揉小说合集| 日本在线免费看| 91大神精品网站在线观看| www.色人阁.com| 伦理片窝窝影院高清在线| 女主插足当小三的heh|