Analysis of key construction points of steel column and frame beam of high-rise steel structure

Time:[2021-8-25]  Hits:2521

Analysis of key construction points of steel column and frame beam of high-rise steel structure

1、 Analysis on key points of steel column construction of high-rise steel structure

Steel column is a vertical component that determines the floor height and the total height of the building, and its fabrication and processing needs to meet the corresponding specifications and standards. At the same time, the shrinkage deformation of the weld and the compression deformation caused by the vertical load need to be considered in the process of turning and blanking. Therefore, the turning and blanking length of the steel column is not equal to the design length, even if it is only a few millimeters, it can not be ignored. Moreover, when the sections of the upper and lower steel columns are completely equal, they are not allowed to be interchanged. It is required that each steel column shall be numbered differently and installed in place correctly. The welding of stiffener plate in rectangular or square steel column shall adopt nozzle electroslag welding according to the requirements of current specifications, and other forms such as opening on box plate and slot plug welding are not allowed.

2、 Analysis on key construction points of high-rise steel structure frame beam

In order to ensure that the joint area at the connection between the frame beam and the steel column has good ductility, connection reliability and floor height accuracy, during factory manufacturing, a cantilever beam (short corbel) is set at the position where the frame beam is located. The connection between the upper and lower flanges of the cantilever beam and the steel column adopts cut penetration weld, and the web adopts fillet weld. The frame beam is connected with the cantilever beam (short corbel) of the steel column, the upper and lower flanges are connected by the full penetration weld of the lining plate (also the arc striking plate), and the web is connected by high-strength bolts. Since the allowable deviation of reinforced concrete construction is far greater than the accuracy requirements of steel structure, when the frame beam is connected with reinforced concrete shear wall or reinforced concrete cylinder wall, the connecting plate of web can be opened with elliptical holes, which shall meet the requirements of hole edge distance. The blanking length of frame beam is also not equal to the design length, and the welding shrinkage deformation shall be considered. The welding shrinkage deformation can be calculated by empirical formula, and then checked according to the actual processing, so as to determine the exact length of the turning and blanking. High strength bolt connection or welding connection can be adopted for the connection of the upper and lower flanges of the frame beam. At present, most of them adopt full penetration welding connection with lining plate. During construction, the lower flange shall be welded first, and then the upper flange shall be welded. One end shall be spot welded for positioning, and then the other end shall be welded. The web is connected with high-strength bolts. It is necessary to fully understand whether friction type or pressure bearing type high-strength bolts are used in the design. The friction coefficient of friction type high-strength bolt should be selected reasonably. When using high-strength bolt group connection, the accuracy of hole position is very important. At present, template drilling and multi axis NC drilling are generally used for hole making. The former has low precision and the latter has high precision, so the latter should be given priority. When the formwork is used to make holes, the accuracy of the formwork shall be ensured to ensure the accuracy requirements of the assembly holes of high-strength bolts and site installation holes. In case of local deviation of hole position, reaming with reamer is only allowed. It is strictly prohibited to use gas cutting for hole expansion. If gas cutting is used for hole expansion, it shall be handled as a major quality accident.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日在线视频 | 欧美一级美片在线观看免费 | 日本亲近相比赛 | 2012中文字幕免费一手机版 | 清清草在线视频 | 又大又粗又黄又湿又爽又刺激 | 成人免费福利视频 | 亚洲性久久久影院 | 久久久久美女 | 老司机精品99在线播放 | 女人十八进入一及黄特别片 | 欧美做a一级视频免费观看 欧美坐爱视频 | 性欧美一级 | 91精品国产露脸在线观看 | 99久久久国产精品免费播放器 | 久久精品国产主播一区二区 | 91po国产在线精品免费观看 | 色域综合| 大美女趴着打光屁股打红 | 毛片在线观看视频 | 永久黄网站色视频免费观看99 | 草草视频网站 | 一卡2卡三卡4卡在线不卡 | 女校生电车痴汉侵犯在线观看 | 日本人乱人乱亲乱色视频观看 | 青免费视频 | 日本漫画工囗全彩内番怀孕 | 色阁阁日韩欧美在线 | 中文国产成人精品久久一 | 免费一级特黄视频 | 午夜在线亚洲 | 亚洲精品第1页 | 中国黄色毛片 | 一级做a爱过程免费视频高清 | 青娱乐在线视频观看 | xxxxx老妇性hd| 日韩精品视频免费网址 | 亚洲视频免费在线 | 色多多www视频在线观看免费 | juliaann被一群黑人 | gay20岁男同志|