Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2433

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 成年大片免费视频播放二级 | 小视频在线观看免费 | 91天堂最新在线观看 | 97麻豆精品国产自产在线观看 | 青青伊人国产 | 人人澡天天澡夜夜澡 | 日本特黄高清免费大片爽 | 五月婷婷丁香在线视频 | 亚洲欧洲精品一区二区三区 | 乱人伦中文字幕视频在线 | 欲色影视天天一区二区三区色香欲 | 天堂网www中文在线资源 | 天天操天天舔天天射 | 探花视频免费观看高清 | 日本中文字幕在线 | 久久精品视频一区二区三区 | 奶大水多 叫的浪 好湿 好硬 | 青青草a| 日本一区高清视频 | 青青国产成人久久91网 | 中文字幕一区二区在线视频 | 综合色在线 | 久久精品国产清高在天天线 | 色伊人影院 | 鸥美一级黄色片 | 一区二区三区四区产品乱码伦 | 桃花视频在线观看免费迅雷 | 日韩视频在线观看中字 | 亚洲天堂一级片 | 天堂网在线观看 | 1级a的观看视频 | 日韩公交车性xxxxhd | 色夜视频 | 天天夜夜操 | 五月婷婷六月丁香 | 日本中文字幕在线视频站 | 在线亚洲欧洲国产综合777 | 肉小说在线阅读 | 久久永久影院免费 | 99精品欧美一区二区三区综合在线 | 中文字幕一区二区三区四区五区人 |