Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2384

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久久久女人精品毛片| videosfree乌克兰hd18| 久久精品中文字幕一区| 欧美视频不卡一区二区三区| 久久久精品免费热线观看| 久久国产欧美日韩精品免费| www.youjizz.com国产| 日本欧美一区二区三区视频麻豆| 久久露脸国产精品| 俄罗斯奶水milkjapan挤奶| 在线91精品国产免费| 草草影院在线观看| 一级二级三级黄色片| 免费va欧美在线观看| 6080yyy午夜韩国理论片手机| 欧美一区二区三区男人的天堂| 日本不卡免费高清视频| 91porny在线| 在线看片a| 久久这里只有精品首页| free白嫩的18sex少| 4hutv四虎最新地址| 久久这里只有精品6| 青草青青视频在线观看| 麻逗传煤永久播放| 女の上司调教在线观看| 巨胸美女扒开腿让我爽| 百合扶她小说| 免费看美女洗澡视频的软件| 久久国产影视免费精品| 波多野结衣免费在线观看| freesex呦交6一12东| 久草热8精品视频在线观看| 一区二区三区免费在线| 中文日产国产精品久久| 在线视频综合视频免费观看| freexnxx日本欧美18| 青年乌克兰摘花第一次| 一卡二卡三卡在线观看| 欧美疯狂party性派对精品| 91制片厂制作果冻传媒所有|