Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2848

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青青青国产在线手机免费观看 | 欧美日韩一区二区三区视频在线观看 | 古代男女肉嗯哦高h | 收集最新中文国产中文字幕 | 青青岛社区 | 99久久国产综合精品成人影院 | 欧美videos粗暴老头 | 老师办公室里做好紧好爽 | 亚洲国产一成人久久精品 | 日本高清观看视频 | caoporn国产精品免费视频 | 屁屁网站在线观看www | 天天弄天天操 | 青青爽国产手机在线观看免费 | 日韩一级在线视频 | 亚洲影院国产 | 青青操影院 | 日韩精品一区二区三区 在线观看 | 影音先锋亚洲资源 | 色橹橹欧美在线观看视频高清免费 | 粗了大了 整进去好爽 | 色婷婷激情综合 | 一二三四免费高清观看在线观看 | 久热精品免费视频 | 久久精品国产一区二区三区肥胖 | 欧美肥妇肥老寡妇 | ai杨超越自带套造梦视频 | 午夜视频在线观看免费高清 | 在闺蜜旁边高h | 车车好快的车车污网站rh | 欧美成人手机视频免费播放 | 日一区二区 | 91资源在线观看 | 香蕉啪啪 | 久久香蕉热 | 午夜在线影视 | 久久精品伊人波多野结 | 中文字幕一二三四 | 在线视频亚洲一区 | 一个人在线观看www视频 | 四虎影院新网址 |