Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2384

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本在线观看| 99久久精品国产高清一区二区| 被调教成了性瘾肉奴| 一色屋精品免费视频 视频| 一级a性色生活片久久毛片| 轻点好疼好大好爽视频| 成人免费视频网| 日本 韩国 三级 国产 欧美| 久草视频资源在线观看| 99久久久精品| 高清国产一区二区三区| 日本视频播放| 男男gaysgay亚洲网站| 最新国产视频| 9久热久re爱免费精品视频| 康熙微服第一部免费版第10集| 猛草视频| 久久 精品 一区二区| 欧美一区二区三区美人| 麻豆网址| 一区二区在线观看| 一区二区在线观看高清| 看一天影院 理论片| 男女靠逼免费视频| 99热国产这里只有精品免费| 欧美精品成人一区二区在线观看| 91亚洲国产成人精品性色| 91麻豆精品国产高清在线| 揉她的大白胸把她摸出水了日本| 玖玖视频精品| 欧美日韩国产人成在线观看| 一区二区三区四区在线观看视频| 久久影视一区| 草莓黄色软件| 最新福利小视频在线播放| 欧美日韩国产一区二区三区播放| ts人妖国产精品| 99视频精品在线| 一个人看免费视频完整版| 日本一区二区三区高清福利视频| free性开放欧美群做a|