Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2360

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 婷婷六月天在线 | 日韩精品一区二区三区高清 | 动漫美女下体阴部漫画 | 俄罗斯6一9呦女 | 四虎影永久在线观看网址 | 女主很浪到处勾人的np小说 | 欧美国产一区二区 | 与青春有关的日子完整版免费观看 | 日韩欧美在线综合网 | 草老逼| 日本aⅴ在线 | 欧美一级高清片在线 | 8090碰成年女人免费碰碰尤物 | 性久久久久久久久久 | 欧美金发大战黑人最粗videos | 色姣姣狠狠撩综合网 | 青青青青青国产免费手机看视频 | 欧美18videosex动漫3d | 永久免费精品影视网站 | 视频二区 调教中字 知名国产 | 日本黄网站高清色大全 | 久久婷五月综合 啪啪网 | freexxxxxhd日本| 日本高清免费不卡在线 | 日本zz00zz00另类视频 | 伊人俺去久久涩五月综合 | 成人激情站 | 91制片厂制作果冻传媒 | 岛国二区三区 | 日日摸日日碰夜夜爽97纠 | 中文字幕一二三四 | 成人国产一区二区三区精品 | 日韩av线上| 成免费网站 | 全国男人的天堂天堂网 | 最近最中文字幕视频 | 日狠狠| 腹肌男gay | 日本人的一区二区三区四区 | 清清草视频在线 | www高清视频 |