国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Homepage > Product > Floor boards
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://www.lhp8.cn

Floor boards

Floor boards

Floor decking steel sheet
Floor deck means pressed steel plate not only as a permanent template of concrete floor, but also as load-bearing bar at the bottom of the floor to participate in the stress calculation, to work together with concrete to form a composite floor slab. 

Performance of composite floor slab: Saving a lot of temporary template; Leaving out all or part of the template support; Cut concrete dosage; Lighten permanent load of the structure; Saving a lot of labor force in transport, storage and installation, which has more important significance in both high-rise buildings and seismic regions; Reducing the workload; Easy laying pipelines of communication, electric power and heating; Also easy laying of heat preservation, sound insulation, heat insulation and vibration isolation material; Improving the floor performance; full playing good steel's tensile strength and ductility and concrete's compressive strength and large stiffness. 
 

 

Name

Modle

Picture

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

Open-type  Floor Deck Sheet

YX70-200-600 

0.8

89.35

23.7

0.9

103.5

25.7

1.0

118.6

31.6

1.2

149.8

40.01

YX75-200-600 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.6

60.38

16.42

0.8

76.57

20.31

1.0

100.64

27.37

1.2

128.19

35.96

YX75-293-880

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.7

102.3

23.481

0.9

122.8

29.52

1.2

164.4

40.464

1.5

205.5

50.313

YX76-344-688

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

91.62

23.46

1.0

119.38

30.61

1.2

142.01

38.98

1.4

167.34

43.90

1.5

178.70

46.80

YX51-253-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.80

19.30

1.0

67.30

24.20

1.2

80.80

29.20

YX51-240-720

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

47.52

17.9

0.9

53.8

20.1

1.0

58.1

22.9

1.2

68.7

28.4

YX51-304-914

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

106.6

24.46

1.0

127.9

30.76

1.2

171.3

42.15

1.5

214.1

52.41

Close Type Floor Decking Sheet

YX65-185-555

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.95

25.614

1

67.44

32.018

1.2

80.928

36.02

Dovetail Type Steel Floor Sheet

YX51-190-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04

YX51-200-600 

 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04


Note: Matters needs attention in floor deck installation 
Column grid spacing generally is 5~9.0m*8~15m and steel structure beam spacing is 3m. Fabrication length of floor deck is 4.97~8.97m. Transport, ation and installation are more difficult, especially for floor deck with arc vertical hoisting. It is difficult to coat between the beams and narrow down, which also disrupts the second beam welding normal working procedure. Fabrication length is limited to 3~6m, which can avoid lifting problems of secondary girder in vertical transportation. When using special soft sling in hoisting, one should check whether the soft slings are torn or cut off. When floor deck is placed aside the steel beam, it should avoi, , , d probe. When operating, personnel should wear seat belts and ensure that sides' parts are on the perimeter security line. Before using penetration welding spot in welding connection, one should prepare leftover material arc welding, adjust welding current adjustment. Because of no horizontal template and the vertical support plate at the bottom of the floor deck, material should not be too concentrated when watering the concrete. It adopts the planar vibrator and apportions vibrating in a timely manner.

Hits:9383 Time:[2020-2-26]

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 99热在线看| 色插综合| 伊人精品视频| 欧美久久香蕉一区二区国产| 78m成人亚洲| 青青艹视频在线观看| 暖暖 免费 日本 高清 在线10| 蜜桃狠狠色伊人亚洲综合网站| 91正在播放极品白嫩在线观看| 日韩欧美亚洲国产一区二区三区| ts在线视频| t66y最新地址一地址二地址三| 久久亚洲视频| 久久国产精品自线拍免费| 日本女人下面毛茸茸| www.4hu影院| 日韩在线视频线视频免费网站| 中文字幕成人免费高清在线视频| 伊人久久影院| 亚洲一区日韩一区欧美一区a| 91久久精品国产91久久性色tv| 97精品国产91久久久久久久| 日韩一区精品视频在线看| 91资源共享| 91在线视频一区| 旗袍美女丝袜高跟老师| 成人国产永久福利看片| 草草浮力影院第一页入口| 久久精品亚洲一区二区| 97夜色爽爽影院在线观看| 青青青草视频| 动漫美女靠逼视频| 男人的天堂一区二区视频在线观看| 99精品一区二区免费视频| 久操社区| 日本日本在线观看视频| 日本高清中文字幕一区二区三区a| sao虎视频在线观看影院| 福利视频三区| 2023男人天堂| 成年美女在线观看免费视频|