Floor boards

Floor boards

Floor decking steel sheet
Floor deck means pressed steel plate not only as a permanent template of concrete floor, but also as load-bearing bar at the bottom of the floor to participate in the stress calculation, to work together with concrete to form a composite floor slab. 

Performance of composite floor slab: Saving a lot of temporary template; Leaving out all or part of the template support; Cut concrete dosage; Lighten permanent load of the structure; Saving a lot of labor force in transport, storage and installation, which has more important significance in both high-rise buildings and seismic regions; Reducing the workload; Easy laying pipelines of communication, electric power and heating; Also easy laying of heat preservation, sound insulation, heat insulation and vibration isolation material; Improving the floor performance; full playing good steel's tensile strength and ductility and concrete's compressive strength and large stiffness. 
 

 

Name

Modle

Picture

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

Open-type  Floor Deck Sheet

YX70-200-600 

0.8

89.35

23.7

0.9

103.5

25.7

1.0

118.6

31.6

1.2

149.8

40.01

YX75-200-600 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.6

60.38

16.42

0.8

76.57

20.31

1.0

100.64

27.37

1.2

128.19

35.96

YX75-293-880

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.7

102.3

23.481

0.9

122.8

29.52

1.2

164.4

40.464

1.5

205.5

50.313

YX76-344-688

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

91.62

23.46

1.0

119.38

30.61

1.2

142.01

38.98

1.4

167.34

43.90

1.5

178.70

46.80

YX51-253-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.80

19.30

1.0

67.30

24.20

1.2

80.80

29.20

YX51-240-720

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

47.52

17.9

0.9

53.8

20.1

1.0

58.1

22.9

1.2

68.7

28.4

YX51-304-914

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

106.6

24.46

1.0

127.9

30.76

1.2

171.3

42.15

1.5

214.1

52.41

Close Type Floor Decking Sheet

YX65-185-555

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.95

25.614

1

67.44

32.018

1.2

80.928

36.02

Dovetail Type Steel Floor Sheet

YX51-190-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04

YX51-200-600 

 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04


Note: Matters needs attention in floor deck installation 
Column grid spacing generally is 5~9.0m*8~15m and steel structure beam spacing is 3m. Fabrication length of floor deck is 4.97~8.97m. Transport, ation and installation are more difficult, especially for floor deck with arc vertical hoisting. It is difficult to coat between the beams and narrow down, which also disrupts the second beam welding normal working procedure. Fabrication length is limited to 3~6m, which can avoid lifting problems of secondary girder in vertical transportation. When using special soft sling in hoisting, one should check whether the soft slings are torn or cut off. When floor deck is placed aside the steel beam, it should avoi, , , d probe. When operating, personnel should wear seat belts and ensure that sides' parts are on the perimeter security line. Before using penetration welding spot in welding connection, one should prepare leftover material arc welding, adjust welding current adjustment. Because of no horizontal template and the vertical support plate at the bottom of the floor deck, material should not be too concentrated when watering the concrete. It adopts the planar vibrator and apportions vibrating in a timely manner.

Hits:9383 Time:[2020-2-26]

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩高清一区二区三区五区七区| 男女xxoo做爰猛烈动| 一级毛片免费观看不收费| 中文字幕亚洲一区二区v@在线| 九色蝌蚪91porny| 日本98xxxxxxxxx| 超级香蕉97在线观看视频| 日韩欧美中文字幕在线视频| 男男gay高h樱花动漫在线观看| 一级寡妇乱色毛片全场免费| 美女与物动xxx| 日本福利在线| 男生被cao尿了| 在线观看成年视频| 草逼免费看| 91啪国| 91久久国产综合精品女同国语| 欧美一区二区高清| 男人午夜天堂| 夜夜夜爽bbbb性视频| 日韩中文字幕在线视频| 日韩欧美福利| 最新毛片网| 超h+高h| porny 九色| 麻豆404| 免费一级毛片免费播放| 在线观看韩国伦理片| 成人免费在线观看视频| 一个人免费看的www| 中文字幕精品视频在线观| 丁香六月婷婷综合激情动漫| 亚洲综合啪啪| 佐佐木明希 中文 在线| 4438x全国最大色| 欧美老肥熟| 日本免费乱人伦在线观看| 青草视频免费看| 一区在线观看| 欧美一区二区三区免费| 绝色网|