国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Homepage > Product >
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://www.lhp8.cn

Zhuhai stone factory

Zhuhai stone factory

Zhuhai Quarry Workshop
Project Description
Guangdong Changheng Group occupies an area of 600000 squire meters,
Measures to prevent dust generated by crushing stones is using the closed steel structure workshop made by Foshan Sheng Bang Steel Structure Co.,(for short “SBS”). The gravel is mainly used for the processing of base-level bedding, highway engineering, airport reclamation and so on. The breaking production line is the leading technology in China with high productivity and high efficiency. The crushing site is close to the dock and the aggregate can be transported by a two-kilometer large conveyor belt to the transport ship.

Project Prominent point
With prefabricated steel structures, high-efficiency deep pre-fabrication is carried out in advance by SBS, which greatly increases construction efficiency and saves twice the time of traditional concrete or steel construction on site. Because it is crushed aggregates, dust is very diffuse, in order to achieve the effect of green mining. SBS seals the production line of the crushing yard, and cooperates with dust-collecting environmental protection equipment, spray atomization and other dust prevention measures. The workshop is completely closed, which is beneficial to the production without weather, but also provides workers with a good working environment, greatly mobilizes workers' enthusiasm for production, and promotes production efficiency. As the crushing equipment needs to periodically replace the crusher's dental plate and vibrating screen, the factory is equipped with a 25-ton crane and can go through every lifting position. It can be produced or overhauled without fear of wind and rain in a closed workshop.
In the Zhuhai Quarry Steel Structure Workshop project undertaken by SBS prefabricated steel structure deep prefabrication construction technology is applied to the prefabrication of steel structures such as pipe frames and equipment platforms. Designed through 3D professional modeling, detailed to the connection position and bolt arrangement. The professional design team conducted a detailed technical investigation, eliminated the difficulties of prefabricated steel structures, multiple nodes, high design requirements, and short installation time, and completed efficiently all production difficulties. The prefabricated depth of all steel structures reaches 98%, and the tolerances of the axis lines, elevations, and joint positions of the system's pipe racks are controlled within 2mm, and there are no reworks beyond the millenium pipe racks. The hole position, aperture, quantity, etc. of several million bolts are matched with the field installation with no mistake.

Project achievement
1.Green and closed mining
The traditional mining work is generally open-pit mining. Due to the relatively large environmental pollution caused by aggregate crushing and screening dust, closed mining significantly reduces the environmental pollution caused by mining. In response to President Xi Jinping’s call to “Lucid waters and lush mountains are invaluable assets.”, the project was conducted by the design team of SBS on site and the technicians used a three-dimensional approach. Software modeling, detailed node construction, simulation of on-site assembly effects, and solving the problem of closed mining restricted by space.

2.Steel structure workshop: weatherproof, anti-vibration, closed production, prevent dust
The overall design of the steel structure is particularly critical for the entire building. The design team of SBS first designs the floor plan using CAD software in Zhuhai quarry workshop, then uses 3D software to model it, and the data is then modeled by the chief engineer. Analyze and contrast, design the scheme that suits the actual demand of the workshop most, make the steel structure workshop reach weatherproof, anti-vibration, closed production, prevent dust
After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.
With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

Zhuhai quarry steel structure design drawings and installation drawings are as follows

設計圖.png

Quarry workshop steel column installation

With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

未命名1.png

Quarry workshop steel beam installation

---2

Quarry workshop wall installation

After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.

---3

Zhuhai steel structure quarrying workshop - multiple transmission belts

20180522101628_8354294


 

 

Hits:12131 Time:[2020-9-5]

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久毛片视频| 99久久99这里只有免费的精品| 欧美日产国产亚洲综合图区一| 九九在线精品视频xxx| 一二三四视频免费观看在线看| 免费人成在线观看视频不卡| 99精品国产一区二区三区| 399.su黑料网| 男人狂躁进女人下面的图片| 操操操综合| 欧美日韩亚洲国产精品| 99色视频在线| 99福利资源久久福利资源| 高h双性肉文| 欧美特黄一免在线观看| 成人香蕉漫画在线观看| 欧美18gayvideos男| a片毛片免费观看| 一道本香蕉视频| 久久综合精品不卡一区二区| 99国产精品一区二区| 一个人在线观看免费高清www| 九九热视频精品在线| 欧美日韩成人| 产区一二三区下卡2021| 俄罗斯美女与禽交zoz0| 制服师生av在线| 九九视频这里只有精品99| 丁香六月婷婷精品免费观看| 99久久综合狠狠综合久久| 8x8x拨插拨插| 欧洲成人爽视频在线观看| 秋霞免费理论片鲁丝在线观看| 免费久久97精品国产自在现线| 欧美乱人伦中文在线观看不卡| 欧美日韩精品高清一区二区| 友田真希juy072羞在线观看| 老司机观看精品一区二区| 白丝被艹| 边吃奶边啪受不了好爽羞羞漫画| 99精选视频|